Tuesday, July 7, 2015

Don’t Blame Bad Software on Developers – Blame it on their Managers

There’s a lot of bad software out there. Unreliable, insecure, unsafe and unusable. It’s become so bad that some people are demanding regulation of software development and licensing software developers as “software engineers” so that they can be held to professional standards, and potentially sued for negligence or malpractice.

Licensing would ensure that everyone who develops software has at least a basic level of knowledge and an acceptable level of competence. But licensing developers won’t ensure good software. Even well-trained, experienced and committed developers can’t always build good software. Because most of the decisions that drive software quality aren’t made by developers – they’re made by somebody else in the organization.

Product managers and Product Owners. Project managers and program managers. Executive sponsors. CIOs and CTOs and VPs of Engineering. The people who decide what’s important to the organization, what gets done and what doesn’t, and who does it – what problems the best people work on, what work gets shipped offshore or outsourced to save costs. The people who do the hiring and firing, who decide how much money is spent on training and tools. The people who decide how people are organized and what processes they follow. And how much time they get to do their work.

Managers – not developers – decide what quality means for the organization. What is good, and what is “good enough”.

Management Mistakes

As a manager, I’ve made a lot of mistakes and bad decisions over my career. Short-changing quality to cut costs. Signing teams up for deadlines that couldn’t be met. Giving marketing control over schedules and priorities, trying to squeeze in more features to make the customer or a marketing executive happy. Overriding developers and testers who told me that the software wouldn’t be ready, that they didn’t have enough time to do things properly. Letting technical debt add up. Insisting that we had to deliver now or never, and that somehow we would make it all right later.

I’ve learned from these mistakes. I think I know what it takes to build good software now. And I try to hold to it. But I keep seeing other managers make the same mistakes. Even at the world’s biggest and most successful technology companies, at organizations like Microsoft and Apple.

These are organizations that control their own destinies. They get to decide what they will build and when they need to deliver it. They have some of the best engineering talent in the world. They have all the good tools that money can buy – and if they need better tools, they just write their own. They’ve been around long enough to know how to do things right, and they have the money and scale to accomplish it.

They should write beautiful software. Software that is a joy to use, and that the rest of us can follow as examples. But they don’t even come close. And it’s not the fault of the engineers.

Microsoft Quality

Problems with software quality at Microsoft are so long-running that “Microsoft Quality” has become a recognized term, for software that is just barely “good enough” to be marginally accepted – and sometimes not even that good.

Even after Microsoft became a dominant, global enterprise vendor, quality has continued to be a problem. A 2014 Computer World article “At Microsoft, quality seems to be job none” complains about serious quality and reliability problems in early versions of Windows 10. But Windows 10 is supposed to represent a sea change for Microsoft under their new CEO, a chance to make up for past mistakes, to do things right. So what's going wrong?

The culture and legacy of “good enough” software has been in place for so long that Microsoft seems to be trapped, unable to improve even when they have recognized that good enough isn’t good enough anymore. This is a deep-seated organizational and cultural problem. A management problem. Not an engineering problem.

Apple’s Software Quality Problems

Apple sets themselves apart from Microsoft and the rest of the technology field, and charges a premium based on their reputation for design and engineering excellence. But when it comes to software, Apple is no better than anyone else.

From the epic public face plant of Apple Maps, to constant problems in iTunes and the App Store, problems with iOs updates that fail to install, data lost somewhere in the iCloud, serious security vulnerabilities, error messages that make no sense, and baffling inconsistencies and restrictions on usability, Apple’s software too often disappoints in fundamental and embarrassing ways.

And like Microsoft, Apple management seems have lost their way:

I fear that Apple’s leadership doesn’t realize quite how badly and deeply their software flaws have damaged their reputation, because if they realized it, they’d make serious changes that don’t appear to be happening. Instead, the opposite appears to be happening: the pace of rapid updates on multiple product lines seems to be expanding and accelerating.

I suspect the rapid decline of Apple’s software is a sign that marketing is too high a priority at Apple today: having major new releases every year is clearly impossible for the engineering teams to keep up with while maintaining quality. Maybe it’s an engineering problem, but I suspect not — I doubt that any cohesive engineering team could keep up with these demands and maintain significantly higher quality.

Marco Arment, Apple has lost the functional high ground, 2015-01-04

Recent announcements at this year’s WWDC indicate that Apple is taking some extra time to make sure that their software works. More finish, less flash. We’ll have to wait and see whether this is a temporary pause or a sign that management is starting to understand (or remember) how important quality and reliability actually is.

Managers: Stop Making the Same Mistakes

If companies like Microsoft and Apple, with all of their talent and money, can’t build quality software, how are the rest of us supposed to do it? Simple. By not making the same mistakes:

  1. Putting speed-to-market and cost in front of everything else. Pushing people too hard to hit “drop dead dates”. Taking “sprints” literally: going as fast as possible, not giving the team time to do things right or a chance to pause and reflect and improve.

    We all have to work within deadlines and budgets, but in most business situations there’s room to make intelligent decisions. Agile methods and incremental delivery provide a way out when you can’t negotiate deadlines or cost, and don’t understand or can’t control the scope. If you can’t say no, you can say “not yet”. Prioritize work ruthlessly and make sure that you deliver the important things as early as you can. And because these things are important, make sure that you do them right.

  2. Leaving testing to the end. Which means leaving bug fixing to after the end. Which means delivering late and with too many bugs.

    Disciplined Agile practices all depend on testing – and fixing – as you code. TDD even forces you to write the tests before the code. Continuous Integration makes sure that the code works every time someone checks in. Which means that there is no reason to let bugs build up.

  3. Not talking to customers, not testing ideas out early. Not learning why they really need the software, how they actually use it, what they love about it, what they hate about it.

    Deliver incrementally and get feedback. Act on this feedback, and improve the software. Rinse and repeat.

  4. Ignoring fundamental good engineering practices. Pretending that your team doesn’t need to do these things, or can’t afford to do them or don’t have time to do them, even though we’ve known for years that doing things right will help to deliver better software faster.

    As a Program Manager or Product Owner or a Business Owner you don’t need to be an expert in software engineering. But you can’t make intelligent trade-off decisions without understanding the fundamentals of how the software is built, and how software should be built. There’s a lot of good information out there on how to do software development right. There’s no excuse for not learning it.

  5. Ignoring warning signs.

    Listen to developers when they tell you that something can’t be done, or shouldn’t be done, or has to be done. Developers are generally too willing to sign on for too much, to reach too far. So when they tell you that they can’t do something, or shouldn’t do something, pay attention.

And when you make mistakes - which you will, learn from them, don’t waste them. When something goes wrong, get the team to review it in a retrospective or run a blameless post mortem to figure out what happened and why, and how you can get better. Learn from audits and pen tests. Take negative feedback from customers seriously. This is important, valuable information. Treat it accordingly.

As a manager, the most important thing you can do is to not set your team up for failure. That’s not asking for too much.

Monday, April 14, 2014

Agile - What’s a Manager to Do?

As a manager, when I first started learning about Agile development, I was confused by the fuzzy way that Agile teams and projects are managed (or manage themselves), and frustrated and disappointed by the negative attitude towards managers and management in general.

Attempts to reconcile project management and Agile haven't answered these concerns. The PMI-ACP does a good job of making sure that you understand Agile principles and methods (mostly Scrum and XP with some Kanban and Lean), but is surprisingly vague about what an Agile project manager is or does. Even a book like the Software Project Manager’s Bridge to Agility, intended to help bridge PMI's project management practices and Agile, fails to come up with a meaningful job for managers or project managers in an Agile world.

In Scrum (which is what most people mean when they say Agile today), there is no place for project managers at all: responsibilities for management are spread across the Product Owner, the Scrum Master and the development team.

We have found that the role of the project manager is counterproductive in complex, creative work. The project manager’s thinking, as represented by the project plan, constrains the creativity and intelligence of everyone else on the project to that of the plan, rather than engaging everyone’s intelligence to best solve the problems.
In Scrum, we have removed the project manager. The Product Owner, or customer, provides just-in-time planning by telling the development team what is needed, as often as every month. The development team manages itself, turning as much of what the product owner wants into usable product as possible. The result is high productivity, creativity, and engaged customers.

We have replaced the project manager with the Scrum Master, who manages the process and helps the project and organization transition to agile practices.

Ken Schwaber, Agility and PMI, 2011

Project Managers have the choice of becoming a Scrum Master (if they can accept a servant leader role and learn to be an effective Agile coach – and if the team will accept them) or a Product Owner (if they have deep enough domain knowledge and other skills), or find another job somewhere else.

Project Manager as Product Owner

The Product Owner is command-and-control position responsible for the “what” part of a development project. It's a big job. The Product Owner owns the definition of what needs to be built, decides what gets done and in what order, approves changes to scope and makes scope / schedule / cost trade-offs, and decides when work is done. The Product Owner manages and represents the business stakeholders, and makes sure that business needs are met. The Product Owner replaces the project manager as the person most responsible for the success of the project (“the one throat to choke”).

But they don’t control the team’s work, the technical details of who does the work or how. That’s decided by the team.

Some project managers may have the domain knowledge and business experience, the analytical skills and the connections in the customer organization to meet the requirements of this role. But it’s also likely to be played by an absentee business manager or sponsor, backed up by a customer proxy, a business analyst or someone else on the team without real responsibility or authority in the organization, creating potentially serious project risks and management problems. Some organizations have tried to solve this by sharing the role across two people: a project manager and a business analyst, working together to handle all of the Product Owner’s responsibilities.

Project Manager as Scrum Master

It seems like the most natural path for a project manager is to become the team’s Scrum Master, although there is a lot of disagreement over whether a project manager can be effective – and accepted – as a Scrum Master, whether they will accept the changes in responsibilities and authority, and be willing to change how they work with the team and the rest of the organization.

The Scrum Master is a “process owner” and coach, not a project manager. They help the team – and the Product Owner – understand how to work in an Agile process framework, what their roles and responsibilities are, set up and guide the meetings and reviews, and coach team members through change and conflict.

The Scrum Master works a servant leader, a (nice) process cop, a secretary and a gofer. Somebody who supports the team and the Product Owner, “carries food and water” for them, tries to protect them from the world outside of the project and helps them solve problems. But the Scrum Master has no direct authority over the project or the team and does not make decisions for them, because Agile teams are supposed to be self-directing, self-organizing and self-managing.

Of course that’s not how things start off. Any group of people must work their way through Tuckman’s 4 stages of team development: Forming-Storming-Norming-Performing. It’s only when they reach the last stage that a group can effectively manage themselves. In the mean time, somebody (the Scrum Master / Coach) has to help the team make decisions that they aren’t ready to make on their own. It can take a long time for a team to reach this point, for people to learn to trust each other – and the organization – enough. And it may not last long, before something outside of the team’s control sets them back: a key person leaving or joining the team, a change in leadership, a shock to the project like a major change in direction or cuts to the budget. Then they need to be led back to a high performing state again.

Coaching the team and helping them out can be a full-time job in the beginning. After the team has got together and learned the process? Not so much. Which is why the Scrum Master is sometimes played part-time by a developer or sometimes even rotated between people on the development team.

But even when the team is performing at a high level, there’s more to managing an Agile project than setting up meetings, buying pizza and trying to stay out of the way. I've come to understand that Agile doesn't make a manager’s job go away. If anything, it expands it.

Managing Upfront

First, there’s all of the work that has to be done upfront at the start of a project – before Iteration Zero. Identifying stakeholders. Securing the charter. Negotiating the project budget and contract terms. Understanding and navigating the organization’s bureaucracy. Figuring out governance and compliance requirements and constraints, what the PMO needs. Working with HR, line managers and functional managers to put the team together, finding and hiring good people, getting space for them to work in and the tools that they need to work with. Lining up partners and suppliers and contractors. Contracting and licensing and other legal stuff. >/p>

The Product Owner might do some of this work - but they can't do it all.

Managing Up and Out

Then there’s the work that needs to be managed outside of the team.

Agile development is insular, insulated and inward-looking. The team is protected from the world outside so they can focus on building features together. But the world outside is too important to ignore. Every development project involves more than designing and building software – often much more than the work of development itself. Every project, even a small project, has dependencies and hand-offs that need to be coordinated with other teams in other places, with other projects, with specialists outside of the team, with customers and partners and suppliers. There is forward planning that needs to be done, setting and tracking drop-dead dates, defining and maintaining interfaces and integration points and landing zones.

Agile teams move and respond to change quickly. These changes can have impacts outside of the team, on the customer, other teams and other projects, other parts of the organization, suppliers and partners. You can try using a Scrum of Scrums to coordinate with other Agile teams up to a point, but somebody still has to keep track of dependencies and changes and delays and orchestrate the hand-offs.

Depending on the contracting model and your compliance or governance environment, formal change control may not go away either, at least not for material changes. Even if the Product Owner and the team are happy, somebody still has to take care of the paperwork to stay onside of regulatory traceability requirements and to stay within contract terms.

There are a lot of people who need to know what’s going on in a project outside of the development team – especially in big projects in big organizations. Communicating outwards, to people outside of the team and outside of the company. Communicating upwards to management and sponsors, keeping them informed and keeping them onside. Task boards and burn downs and big visible charts on the wall might work fine for the team, but upper management and the PMO and other stakeholders need a lot more, they need to understand development status in the overall context of the project or program or business change initiative.

And there’s cost management and procurement. Forecasting and tracking and managing costs, especially costs outside of development labor costs. Contracts and licensing need to be taken care of. Stuff needs to be bought. Bills need to be paid.

Managing Risks

Scrum done right (with XP engineering practices carefully sewed in) can be effective in containing many common software development risks: scope, schedule, requirements specification, technical risks. But there are other risks that still need to be managed, risks that come from outside of the team: program risks, political risks, partner risks and other logistical risks, integration risks, data quality risks, operational risks, security risks, financial risks, legal risks, strategic risks.

Scrum purposefully has many gaps, holes, and bare spots where you are required to use best practices – such as risk management.
Ken Schwaber
While the team and the Product Owner and Scrum Master are focused on prioritizing and delivering features and resolving technical issues, somebody has to look further out for risks, bring them up to the team, and manage the risks that aren't under the team’s control.

Managing the End Game

And just like at the start of a project, when the project nears the end game, somebody needs to take care of final approvals and contractual acceptance, coordinate integration with other systems and with customers and partners, data setup and cleansing and conversion, documentation and training. Setting up the operations infrastructure, the facilities and hardware and connectivity, the people and processes and tools needed to run the system. Setting up a support capability. Packaging and deployment, roll out planning and roll back planning, the hand-off to the customer or to ops, community building and marketing and whatever else is required for a successful launch. Never mind helping make whatever changes are required to business workflows and business processes that may be required with the new system.

Project Management doesn't go away in Agile

There are lots of management problems that need to be taken care of in any project. Agile spreads some management responsibilities around and down to the team, but doesn’t make management problems go away. Projects can’t scale, teams can’t succeed, unless somebody – a project manager or the PMO or someone else with the authority and skills required – takes care of them.

Thursday, November 14, 2013

Applying the 80:20 Rule in Software Development

Managers don’t want to think harder than they have to. They like simple rules of thumb, quick and straightforward ways of looking at problems and getting pointed in the right direction. The simpler, the better.

One of the most useful rules of thumb is the 80:20 rule:

80% of effects come from 20% of causes and 80% of results come from 20% of effort.
It’s the flip side of diminishing returns: instead of getting less out of doing more, you can get more from doing less, by working smarter, not harder.

You can see obvious cases where the 80:20 rule applies in software without looking too hard. For example, 80% of performance improvements are found by optimizing 20% of the code – although the actual ratio is probably much closer to 90:10 or even 99:1 when it comes to performance optimization. But whether it's 80:20 or 90:10 or 70:30, the rule works essentially the same.

80:20 Who uses What, What do you Really have to Deliver

Another well-known 80:20 rule in software is that 80% of users only use 20% of features. This came out of research from the Standish Group back in 2002, where they found that:

  • 45% of features were never used;
  • 19% used rarely;
  • 16% sometimes;
  • only 20% were used frequently or always.

Like the like the cost of change curve, this is another example of a widely-held “truth” in software development which is based on limited evidence – it would be good to see more research that backs this claim up.

This finding has heavily influenced Agile and Lean development, encouraging people to focus on delivering minimum marketable features or defining a minimum viable product, even in large-scale enterprise projects. Instead of trying to design and plan out all of the features that a system may need, come up with the smallest, tightest possible definition of what people think is important and useful in itself, prioritize the features and deliver in steps as quickly as possible.

Standish Group’s latest research shows that thinking smaller and delivering less is a key to improving the success of software projects: While more than 70% of small projects are delivered successfully, large projects have “virtually no chance of success: … more than twice the chance of being late, over budget, and missing critical features”.

“In summary, there is no doubt that focusing on the 20% of the features that give you 80% of the value will maximize the investment in software development and improve overall user satisfaction. After all, there is never enough time or money to do everything. The natural expectation is for executives and stakeholders to want it all and want it all now. Therefore, reducing scope and not doing 100% of the features and functions is not only a valid strategy, but a prudent one.”

But thinking small and delivering less faster can also come with a downside: a “reduction in value and innovation”, when people play too safe and set the bar too low. Delivering 20% or 50% of a system won’t always be enough to succeed, even supposing that you can figure out what the right 20-50% is – some of those “extra features” are still important and necessary to somebody even if they aren't used much. You’ll need more than a minimum viable product to redefine a market or how people work or play, to set the world on fire.

80:20 Bugs and Testing

Code quality, bugs and testing is another area where the 80:20 rule is especially useful:

80% of bugs are found in 20% of the code

90% of downtime comes from 10% (or less) of defects

Bugs cluster in certain parts of code, especially serious bugs. Most of your most serious problems will come from a small number of bugs.

“80% of the errors and crashes in Windows and Office were caused by 20% of the entire pool of bugs detected.”
Microsoft’s CEO: 80-20 Rule Applies to Bugs, Not Just Features Oct 2002
Understanding where most of your most serious bugs are and why they got there and what you need to do to prevent more of them is where you should be spending a lot of your time.

Some studies have found that half of your code might not have any bugs at all, while most bugs will be found in only 10-20% of the code – often the 10-20% of the code that is changed most often (see “80:20 Which code gets changed and how often” below).

Each time that you find a bug in this code, chances are that it means there are still more bugs left to find and fix. The more bugs you find, the more chances there are that there are still more bugs to be found, in a downward spiral.

Capers Jones says that having to work on – or work around – high-risk error-prone code is the single largest drag on developer productivity over the life of a system and that not figuring out what code is causing you the most trouble and doing something about it is one of the most expensive mistakes that a development team can make.

Each time that you touch this code, even when you’re trying to fix it, there is a good chance that you are making it worse, not better: there is more than a 20% chance that a developer trying to fix a bug in error-prone code will accidentally introduce a new bug as a side-effect. Most of the effort put into trying to understand this code and fix it and understand it and fix it over and over, is wasted:

“Most error-prone modules are so complex and so difficult to understand that they cannot be repaired once they are created“.

When code gets this bad, it needs extensive and “brutal refactoring” to make it understandable and safer to work with, or it needs to be “surgically removed and replaced” with new code written from scratch by somebody who knows what they are doing.

It’s not hard to identify what parts of the code are bad if you have the same people working on the same code for a while – ask anyone on the team and they’ll know where that nasty stink is coming from. In big systems and big organizations with lots of turnover, you’ll probably need to track bugs over time and mine defect data for bug clusters, rather than just fixing bugs and moving on.

80% of time spent fixing bugs is on 20% of the bugs

Some bugs are much harder to fix than others. Sometimes because the code is so bad (see the rule above). Sometimes because the problems are so hard to reproduce and debug. Sometimes because they are much deeper than they appear to be – fundamental bugs in design, bugs that you can’t code your way out of. Be prepared for those times when even your best developers won’t be able to tell you when – or even if – some bugs will be fixed.

80:20 Which code gets changed and how often

Michael Feathers has found more 80:20 power law distributions by looking at changes to code bases over time (“Discovering Startling Things from your Version Control System”):

80% of changes are made in 20% of the code

A lot of code is written once, and never changed: static and standardized interfaces, basic wiring and config, back office functions. Then there’s other code that changes all of the time: the 20% of features which are used 80% of the time and need to be tweaked and tuned and occasionally overhauled as needs change; core code that needs to be optimized; and other code that needs to be fixed a lot because it contains too many bugs (back again to the 80:20 bug cluster rule above).

Feathers has found that code that gets changed a lot also tends to get bigger as time gets on, because of a simple, built-in bias:

it is easier to add code to an existing method than to add a new method and easier to add another method to an existing class than to add a new class.
As a result, many systems end up with a few very large classes which contain a few very large methods, and which keep getting bigger and bigger as code gets changed.

Hot spots in code are easy to find by reviewing check-in history for areas with high churn and through simple static analysis of the code base. This is where you get the most value out of refactoring, where you can do the most to keep the code from losing structure and becoming dangerously unmaintainable – and it is also the code that naturally should get refactored most often as part of making changes (changed more often = refactored more often if you’re refactoring properly).

80:20 and Programming Time

The first 80% of code is done in 20% of time…the remaining 20% of the code takes the other 80% of the time

It usually doesn't take long to get something almost working, or something that looks like it works, especially if you’re working iteratively and incrementally, delivering frequently and fast.

But there’s a lot of work that still needs to be done “behind the scenes” to finish things up, to catch the edge cases and handle errors, make sure that the system performs and scales, find and fix all of the little bugs, get the code into shape before it can be deployed. Product Owners/Customers (and managers) often don’t understand why it takes so long to get the “last 20%” of the work done. And programmers often forget how long this takes too, and don’t include this work in their estimates. This is why a developer’s estimates are so often wrong. And why prototyping can be so dangerous in setting unrealistic expectations.

80:20 and Managing Software Development

Keeping the 80:20 rough rule in mind can save you money and time, and improve your chance of success by keeping you focused on what’s important: the features that really matter, the parts of the code where most of your most serious bugs are (and the bugs that take the most time to fix); the parts of the code that are changing the most; and how and where your team really spends their time.

Thursday, September 12, 2013

The Real Cost of Change in Software Development

There are two widely opposed (and often misunderstood) positions on how expensive it can be to change or fix software once it has been designed, coded, tested and implemented. One holds that it is extremely expensive to leave changes until late, that the cost of change rises exponentially. The other position is that changes should be left as late as possible, because the cost of changing software is – or at least can be – essentially flat (that’s why we call it “soft”ware).

Which position is right? Why should we care? And what can we do about it?

Exponential Cost of Change

Back in the early 1980s, Barry Boehm published some statistics (Software Engineering Economics, 1981) which showed that the cost of making a software change or fix increases significantly over time – you can see the original curve that he published here.

Boehm looked at data collected from Waterfall-based projects at TRW and IBM in the 1970s, and found that the cost of making a change increases as you move from the stages of requirements analysis to architecture, design, coding, testing and deployment. A requirements mistake found and corrected while you are still defining the requirements costs almost nothing. But if you wait until after you've finished designing, coding and testing the system and delivering it to the customer, it can cost up to 100x as much.

A few caveats here. First, the cost curve is much higher in large projects (in smaller projects, the cost curve is more like 1:4 instead of 1:100). Those cases where the cost of change rises up to 100x are rare, what Boehm calls Architecture-Breakers, where the team gets a fundamental architectural assumption wrong (scaling, performance, reliability) and doesn't find out until after customers are already using the system and running into serious operational problems. And this analysis was all done on a small data sample from more than 30 years ago, when developing code was much more expensive and time-consuming and paperworky, and the tools sucked.

A few other studies have been done since then which mostly back up Boehm's findings – at least the basic idea that the longer it takes for you to find out that you made a mistake, the more expensive it is to correct it. These studies have been widely referenced in books like Steve McConnell’s Code Complete, and used to justify the importance of early reviews and testing:

Studies over the last 25 years have proven conclusively that it pays to do things right the first time. Unnecessary changes are expensive. Researchers at Hewlett-Packard, IBM, Hughes Aircraft, TRW, and other organizations have found that purging an error by the beginning of construction allows rework to be done 10 to 100 times less expensively than when it's done in the last part of the process, during system test or after release (Fagan 1976; Humphrey, Snyder, and Willis 1991; Leffingwell 1997; Willis et al. 1998; Grady 1999; Shull et al. 2002; Boehm and Turner 2004).

In general, the principle is to find an error as close as possible to the time at which it was introduced. The longer the defect stays in the software food chain, the more damage it causes further down the chain. Since requirements are done first, requirements defects have the potential to be in the system longer and to be more expensive. Defects inserted into the software upstream also tend to have broader effects than those inserted further downstream. That also makes early defects more expensive.

There’s some controversy over how accurate and complete this data is, how much we can rely on it, and how relevant it is today when we have much better development tools and many teams have moved from heavyweight sequential Waterfall development to lightweight iterative, incremental development approaches.

Flattening the Cost of Changing Code

The rules of the game should change with iterative and incremental development – because they have to.

Boehm realized back in the 1980s that we could catch more mistakes early (and therefore reduce the cost of development) if we think about risks upfront and design and build software in increments, using what he called the Spiral Model, rather than trying to define, design and build software in a Waterfall sequence.

The same ideas are behind more modern, lighter Agile development approaches. In Extreme Programming Explained (the 1st edition, but not the 2nd) Kent Beck states that minimizing the cost of change is one of the goals of Extreme Programming, and that a flattened change cost curve is “the technical premise of XP”:

Under certain circumstances, the exponential rise in the cost of changing software over time can be flattened. If we can flatten the curve, old assumptions about the best way to develop software no longer hold…

You would make big decisions as late in the process as possible, to defer the cost of making the decisions and to have the greatest possible chance that they would be right. You would only implement what you had to, in hopes that the needs you anticipate for tomorrow wouldn't come true. You would introduce elements to the design only as they simplified existing code or made writing the next bit of code simpler.
It’s important to understand that Beck doesn't say that with XP the change curve is flat. He says that these costs can be flattened if teams work towards this, leveraging key practices and principles in XP, such as:
  • Simple Design, doing the simplest thing that works, and deferring design decisions as late as possible (YAGNI), so that the design is easy to understand and easy to change
  • continuous, disciplined Refactoring to keep the code easy to understand and easy to change
  • Test-First Development – writing automated tests upfront to catch coding mistakes immediately, and to build up a testing safety net to catch mistakes in the future
  • developers collaborating closely and constantly with the Customer to confirm their understanding of what they need to build and working together in Pairs to design solutions and solve problems, and catch mistakes and misunderstandings early
  • relying on working software over documentation to minimize the amount of paperwork that needs to be done with each change (write code, not specs)
  • the team’s experience working incrementally and iteratively – the more that people work and think this way, the better they will get at it.

All of this makes sense and sounds right, although there are no studies that back up these assertions, which is why Beck dropped this change curve discussion from the second edition of his XP book. But by then the idea that change could be flat with Agile development had already become accepted by many people.

The importance of Feedback

Scott Amber agrees that the cost curve can be flattened in Agile development, not because of Simple Design, but because of the feedback loops which are fundamental to iterative, incremental development. Agile methods optimize feedback within the team, developers working closely together with each other and with the Customer and relying on continuous face-to-face communications. And following technical practices like Test-First Development and Pair Programming and Continuous Integration makes these feedback loops even tighter.

But what really matters is getting feedback from the people using the system – it’s only then that you know if you got it right or what you missed. The longer that it takes to design and build something and get feedback from real users, the more time and work that is required to get working software into a real customer’s hands, the higher your cost of change really is.

Optimizing and streamlining this feedback loop is what is driving the Lean Startup approach to development: defining a Minimum Viable Product (something that just barely does the job), getting it out to customers as quickly as you can, and then responding to user feedback through Continuous Deployment and A/B testing techniques until you find out what customers really want.

Even flat change can still be expensive

Even if you do everything to optimize these feedback loops and minimize your overheads, this still doesn’t mean that change will come cheap. Being fast isn’t good enough if you make too many mistakes along the way.

The Post Agilist uses the example of painting a house: assume that it costs $1,000 each time you paint the house, whether you paint it blue or red or white. The cost of change is flat. But if you have to paint it blue first, then red, then white before everyone is happy, you’re wasting time and money.

“No matter how expensive or change the ‘cost of change’ curve may be, the fewer changes that are made, the cheaper and faster the result will be…Planning is not a four letter word.” [however, I would like to point out that “plan” is].
Spending too much time upfront in planning and design is waste. But not spending enough time upfront to find out what you should be building and how you should be building it before you build it, and not taking the care to build it carefully, is also a waste.

Change gets more expensive over time

You also have to accept that the incremental cost of change will go up over the life of a system, especially once a system is being used. This is not just a technical debt problem. The more people using the system, the more people who might be impacted by the change if you get it wrong, the more careful you have to be, which means you need to spend more time on planning and communicating changes, building and testing a roll-back capability, and roll changes out slowly using Canary Releases and Dark Launching – which add costs and delays to getting feedback.

There are also more operational dependencies that you have to understand and take care of, and more data that you have to change or fix up, making changes even more difficult and expensive. If you do things right, keep a good team together and manage technical debt responsibly, these costs should rise gently over the life of a system – and if you don’t, that exponential change curve will kick in.

What is the Real Cost of Change?

Is the real cost of change exponential, or is it flat? The truth is somewhere in between.

There’s no reason that the cost of making a change to software has to be as high as it was 30 years ago. We can definitely do better today, with better tools and better, cheaper ways of developing software. The keys to minimizing the costs of change seem to be:

  1. Get your software into customer hands as quickly as you can. I am not convinced that any organization really needs to push out software changes 10-50-100x a day, but you don’t want to wait months or years for feedback either. Deliver less, but more often. And because you’re going to deliver more often, it makes sense to build a Continuous Delivery pipeline so that you can push changes out efficiently and with confidence. Use ideas from Lean Software Development and maybe Kanban to identify and eliminate waste and to minimize cycle time.
  2. We know that even with lots of upfront planning and design thinking, we won’t get everything right upfront - this is the Waterfall fallacy. But it’s also important not to waste time and money iterating when you don’t need to. Spending enough time upfront in understanding requirements and in design to get it at least mostly right the first time can save a lot later on.
  3. And whether you’re working incrementally and iteratively, or sequentially, it makes good sense to catch mistakes early when you can, whether you do this through Test First Development and pairing, or requirements workshops and code reviews, whatever works for you.

Friday, March 15, 2013

Yes Small Companies Can – and Should – Build Secure Software

"For large software companies or major corporations such as banks or health care firms with large custom software bases, investing in software security can prove to be valuable and provide a measurable return on investment, but that's probably not the case for smaller enterprises, said John Viega, executive vice president of products, strategy and services at SilverSky and an authority on software security."
Schneier on Security: Is Software Security a Waste of Time?

Bullshit.

It’s foolish and short sighted to pretend that software security is only a problem for enterprises or enterprise software vendors. Small companies write software that big companies use, which means that these big companies are putting their customers at risk. This is happening all of the time.

And it’s wrong to believe that small shops can’t do anything practical about building secure software. I'm not talking about swallowing something like Microsoft’s SDL whole – for some people, the argument seems to be that

“If you aren't following Microsoft’s SDL then you can’t build secure software, and nobody except Microsoft can follow the SDL, so you might as well give up.”

But you don't need to adopt the SDL, or any other large-scale, expensive, enterprise-quality software security program. Any small shop can take some reasonable steps that will go a long way to building secure software:

  1. First, take some time upfront to understand the business requirements for security and compliance and for handling confidential and private data – what information do you need to protect, who can see and change what data, what data do you have to encrypt, what data should you not store at all, what do you need to log? All of this is just part of understanding what kind of system you need to build.

  2. Think about your application architecture, and choose a good application framework. For all the noise about “emergent design”, almost everybody who builds business apps – even small teams following Agile/Lean methods – use some kind of framework. It’s stupid not to. A good framework takes care of all kinds of problems for you – including security problems – which means that you can get down to delivery features faster, which is after all the point.

    If you’re a Ruby developer, Rails will take care of a lot of security problems for you – as long as you make sure to use Rails properly and you make sure to keep Rails up to date (the Rails community has made some mistakes when it comes to security, but they seem committed to fixing their mistakes).

    Play, a popular application framework for Java and Scala, includes built-in security features and controls, as do many other frameworks for Java, and frameworks for PHP and other languages, and of course there’s .NET for Microsoft platforms, which is loaded with security capabilities.

    None of these frameworks will take care of every security problem for you – even if you use them properly and make sure to keep them patched as security vulnerabilities are found. But using a good framework will reduce risk significantly without adding real costs or time to development. And when you do need to do something about security that may not be included in the framework (like properly handling encryption), there are good security libraries available like Apache Shiro that will make sure that you do things right while still saving time and costs.

  3. Write solid, defensive code: code that works and won’t boink when it is used in the real world. Check input parameters and API return values, do a good job of error handling, use safe libraries. Program responsibly.

  4. Take advantage of static analysis tools to catch bugs, including security bugs. At least understand and use any static analysis checkers that are in your IDE and free, easy to use tools like Findbugs and PMD for Java, or Microsoft’s tools for .NET. They're free, they find bugs so you don't have to - why wouldn't you use them?

    Most commercial tools are too expensive for small teams, although if Cigital comes through with small-bundle pricing for Secure Assist this would finally provide small development teams high-quality feedback on security bugs.

Sure there is a lot more that you could do or should do if you need to. But even modest and reasonable steps will go a long way to making software safer for customers. And there’s no reasons that small teams can’t – or shouldn't – do this.

Wednesday, February 13, 2013

Releasing more often drives better Dev and better Ops

One of the most important decisions that we made as a company was to release less software, more often. After we went live, we tried to deliver updates quarterly, because until then we had followed a staged delivery lifecycle to build the system, with analysis and architecture upfront, and design and development and testing done in 3-month phases.

But this approach didn't work once the system was running. Priorities kept changing as we got more feedback from more customers, too many things needed to fixed or tuned right away, and we had to deal with urgent operational issues. We kept interrupting development to deploy interim releases and patches and then re-plan and re-plan again, wasting everyone’s time and making it harder to keep track of what we needed to do. Developers and ops were busy getting customers on and fire fighting which meant we couldn't get changes out when we needed to. So we decided to shorten the release cycle down from 3 months to 1 month, and then shorten it down again to 3 weeks and then 2 weeks, making the releases smaller and more focused and easier to manage.

Smaller, more frequent releases changes how Development is done

Delivering less but more often, whether you are doing it to reduce time-to-market and get fast feedback in a startup, or to contain risk and manage change in an enterprise, forces you to reconsider how you develop software. It changes how you plan and estimate and how you think about risks and how you manage risks. It changes how you do design, and how much design you need to do. It changes how you test. It changes what tools people need, and how much they need to rely on tools.

It changes your priorities. It changes the way that people work together and how they work with the customer, creating more opportunities and more reasons to talk to each other and learn from each other. It changes the way that people think and act – because they have to think and act differently in order to keep up and still do a good job.

Smaller, more frequent releases changes how Development and Ops work together

Changing how often you release and deploy will also change how operations works and how developers and operations work together. There’s not enough time for heavyweight release management and change control with lots of meetings and paperwork. You need an approach that is easier and cheaper. But changing things more often also means more chances to make mistakes. So you need an approach that will reduce risk and catch problems early.

Development teams that release software once a year or so won’t spend a lot of time thinking about release and deployment and operations stuff in general because they don’t have to. But if they’re deploying every couple of weeks, if they’re constantly having to push software out, then it makes sense for them to take the time to understand what production actually looks like and make deployment - and roll-back – easier on them and easier on ops.

You don’t have to automate everything to start – and you probably shouldn't until you understand the problems well enough. We started with check lists and scripting and manual configuration and manual system tests. We put everything under source control (not just code), and then started standardizing and automating deployment and configuration and roll-back steps, replacing manual work and check lists with automated audited commands and health checks. We've moved away from manual server setup and patching to managing infrastructure with Puppet. We’re still aligning test and production so that we can test more deployment steps more often with fewer production-specific changes. We still don’t have a one-button deploy and maybe never will, but release and deployment today is simpler and more standardized and safer and much less expensive.

Deployment is just the start

Improving deployment is just the start of a dialogue that can extend to the rest of operations. Because they’re working together more often, developers and ops will learn more about each other and start to understand each other’s languages and priorities and problems.

To get this started, we encouraged people to read Visible Ops and sent ops and testers and some of the developers and even managers on ITIL Foundation training so that we all understood the differences between incident management and problem resolution, and how to do RCA, and the importance of proper change management – it was probably overkill but it made us all think about operations and take it seriously. We get developers and testers and operations staff together to plan and review releases, and to support production and in RCA whenever we have a serious problem, and we work together to figure out why things went wrong and what we can do to prevent them from happening again. Developers and ops pair up to investigate and solve operational problems and to improve how we design and roll out new architecture, and how we secure our systems and how we set up and manage development and test environments

It sounds easy. It wasn't. It took a while, and there were disagreements and problems and back sliding, like any time you fundamentally change the way that people work. But if you do this right, people will start to create connections and build relationships and eventually trust and transparency across groups – which is what Devops is really about.

You don’t have to change your organization structure or overhaul the culture – in most cases, you won’t have this kind of mandate anyways. You don’t have to buy into Continuous Deployment or even Continuous Delivery, or infrastructure as code, or use Chef or Puppet or any other Devops tools – although tools do help.

Once you start moving faster, from deploying once a year every few months to once a month and as your organization’s pace accelerates, people will change the way that they work because they have to.

Today the way that we work, and the way that we think about development and operations, is much different and definitely healthier. We can respond to business changes and to problems faster, and at the same time our reliability record has improved dramatically. We didn't set out to “be Agile” – it wasn't until we were on our way to shorter release cycles that we looked more closely at Scrum and XP and later Kanban to see how these methods could help us develop software. And we weren't trying to “do Devops” either – we were already down the path to better dev and ops collaboration before people started talking about these ideas at Velocity and wherever else. All we did was agree as a company to change how often we pushed software into production. And that has made all the difference.

Wednesday, January 9, 2013

Hardening Sprints. What are they? Do you need them?

For anyone who is developing software using Scrum, XP or another incremental development approach, the idea of a “hardening sprint” or a “release iteration” is bound to come up. But people disagree about what a “hardening sprint” should include, when you need to do one, and if you should do them at all. There is a deep divide between people who recognize that spending some time on hardening is needed for many environments, and people who are adamant that allocating some time for hardening is a sign that you are doing some things – or everything – wrong.

Hardening to make sure that Done means Done

In a hardening sprint, the team stops focusing on delivering new features or architecture, and instead spends their time on stabilizing the system and getting it ready to be released.

For some people, hardening sprints are for completing testing and fixing work that couldn't be done – or didn't get done – earlier. This might include UAT or other final acceptance testing if this is built into a contract or governance model.

Mike Cohn recognizes that teams may need a “release sprint” at the end of each release cycle, because the team’s definition of “done” may not be enough – that a "potentially shippable product" and a system that is actually “shippable” or ready for production aren't the same thing. He suggests that after every 3-5 feature iterations, the team may want to schedule a release sprint to do work like expensive manual system and integration testing and extra reviews, whatever is needed to make sure that what they think is done, is actually done.

Anand Viswanath, in “The end of regression, stabilisation, hardening or release sprints”, describes a common approach where teams schedule 1 or 2 stabilization sprints every 4-6 iterations to do regression testing and system testing in a staging environment, and then fix whatever bugs are found. As he points out, it’s hard to predict how much testing might be required and long it will take to fix whatever problems are found, so the idea is to time box this work and then triage the results.

Because this can be an expensive and risky and stressful way to work, Vishwanath recommends following Continuous Delivery to build an automated test pipeline through to staging in order to catch as many problems as early as possible. This is a good idea, but most large projects, especially projects starting from a legacy code base, will still probably need some kind of hardening or integration testing phase at regular points regardless of what kind of continuous testing they are doing.

Some testing, like interoperability testing with other systems and operational testing, can’t be done effectively until later, when there is enough of a working system to do end-to-end testing, and some of this testing can only be done in staging (if you have a staging environment), or in production. For some systems, load testing and stress testing and soak testing also needs to be left to later, because these teams don’t have access to a big enough test system to run high load scenarios before they get to production.

Is Hardening a sign that you aren't doing things right?

Not everyone thinks that scheduling a hardening sprint for testing and fixing like this is a good idea:

“[a hardening sprint] might take the cake for stupid things invented that has lead to institutionalized delusion and ‘Agile’ dysfunction.” Janelle Klein, Who Came up with the “Hardening Sprint”?
For many people, a hardening sprint or release sprint is a bad “process smell”: a sign that the team isn't working properly or thinking clearly:
“The problem with “hardening sprints” is that you are lying. You make believe your imaginary burndown during the initial sprints shows that you are approaching Done. But it’s a lie--you aren't getting any closer to being ready for Production until you begin your Test phase. You wrote a pile of code that you didn't test adequately. You don’t know how good it is, you don’t know how much work you have left to do, and you don’t know how much longer it will take, until you are deep into your Test phase.” Richard Kasperowski, Hardening sprints? Sorry, you’re not Agile

Ron Jeffries says that a hardening sprint for testing and fixing is a clear anti-pattern. I agree: if you need a separate sprint to fix bugs, then you’re doing something wrong. But that doesn't mean that you won’t need extra time to fix things before the system goes live – knowing that it is wrong doesn't make the bugs go away, you still have to fix them. As somebody else on this same discussion thread points out, there is a risk that your “definition of done” could fall short of what is actually needed by the customer, so you should plan for 1 or more hardening sprints before release, to double-check and stabilize things, just in case.

In these cases, the need for hardening sprints is a sign of a team’s immaturity (from a post by Paul Beavers):

  1. A beginning agile team will prefer to schedule 6 hardening iterations after a 12 iteration development plan. This is “agile” to the hard core “waterfall guy”.
  2. As time goes by, the team will mature a bit and you will see the seasoned agile team will shrink the number of required hardening iterations at the end, just because they understand they need to “fix” the high severity bugs as they go and QA understands they need to test closer and better early up in the release cycle.
  3. Further down the road the team will notice that by adding a hardening iteration in the middle of the development cycle (and flushing out even lesser priority bugs earlier on in the process), it will help them to maintain cadence later on.
  4. The final step of maturity is there when the team starts understanding “hardening is not required any more”, because they made fixing bugs part of their daily routines.

Hardening is whatever you need to do to Make the System Ready for Production

Another way of looking at hardening, is that this is when you stop thinking about features and focus all of your time on the detailed steps of deploying, installing and configuring the system and making sure that everything is working from end-to-end. In a hardening sprint, your most important customers are operations and support, the people who are going to make sure that the system is running, rather than the end users.

For some teams, this kind of hardening can come as an ugly and expensive surprise, after they understand that what they need to do is to take a working functional prototype and make it ready for the real world:

“All those things that got skipped in the first phase - error handling, monitoring, administration - need to get put into the product.” Catherine Powell, The "Hardening Myth"

But a hardening sprint can also be when when you take care of what operations calls hardening: reviewing and preparing the production environment and securing the run-time, tightening up access to production data, double-checking system and application configs, making sure that auditing is enabled properly, wiring the system in to operations monitoring and metrics collection, checking system dependencies like platform software versions and patch levels (and making sure that all of the systems are consistent, that there aren't any snowflakes), completing final security reviews and other review and release gates, and making sure that the people installing and running the software have the correct instructions.This is also when you need to prepare your roll-back plan or recovery plan if something bad happens with the release, and test your roll-back and recovery steps. Walk through and rehearse the release process and checklists, and make sure that everyone is prepared to roll out patches quickly after the release is done.

Hardening is something that you have to do

Some people see an obvious need for hardening sprints. For example, Dean Leffingwell includes hardening sprints in his “Scaled Agile Framework”, because there is some work that can only really be done in a final hardening phase:

  • Final exploratory and field testing
  • Checklist validation against release, QA and standards governance
  • Release signoffs if you need them
  • Ops documentation
  • Deployment package
  • Communicate release to everyone (hard to do in big companies)
  • Traceability etc for high assurance and regulatory compliance
Leffingwell makes it clear that hardening shouldn't include system integration, fixing high priority bugs, automating test scripts, user documentation, regression testing and code cleanup. There is other work that should be done earlier – but in the first year or so, will probably need to be done in a late hardening phase:
  • Cross-component integration, integration with third-party/customer
  • Integrated system-level testing
  • Final QA sign-offs
  • User doc finalization
  • Localization

Dan Rawsthorne explains that teams need at least one release sprint at first to get ready for release to production, because until you've actually done it, you don’t really know what you need to do. Release sprints include tasks like:

  • Exploratory testing to double check that key features are working properly
  • Stress testing/load testing/performance testing – testing that is expensive to setup and do
  • Interoperability testing with other production systems
  • Fix whatever comes out of this testing
  • Review and finish off any documentation
  • Train support and sales and customers on new features
  • Help with press releases and other marketing material

The Software Project Manager’s Bridge to Agility anticipates that teams will need at least a short hardening iteration before the system is ready for release, even if they frontload as much testing as possible. A release iteration is not a test-fix phase – it’s when you prepare for the release: capturing screenshots for marketing materials, final tests, small tweaks, finish documentation for whoever needs it, training. The authors suggest however that if some developers have any time left over in the release iteration, they can do some refactoring and other cleanup – which I think is bad advice, given that at this point you don’t want to be introducing any new variables or risks.

Disciplined Agile Delivery, a method that was developed by Scott Ambler at IBM to scale Agile practices to large organizations and large projects, includes a Transition Phase before each release to take care of:

  • Transition planning and coordination
  • End-of-lifecycle testing and fixing
  • Testing and rehearsing deployment
  • Data setup and migration
  • Pilots and beta testing (short UAT if necessary)
  • Reviewing and finalizing documentation
  • Preparing operations and support
  • Stakeholder training
This kind of transition can take almost no time, or it can take several weeks, depending on the situation.

Hardening – taking some time to make sure that the system is really ready to be released – can’t be avoided. The longer your release cycles, the further away development is from day-to-day production, the more hardening you need. Even if you've been doing disciplined testing and reviews in stream, you’re going to find some problems at the end. Even if you planned ahead for transition, you’re going to run into operational details that you didn't know about or didn't understand until the end.

When we first launched our platform from startup, we had to do hardening and stabilization work before going live to get the system ready, and some more work afterwards to deal with operational issues and requirements that we weren't prepared for. We included time at the end of subsequent releases for extra testing, deployment and roll back planning, and release coordination.

But as we shortened our release cycle, releasing less but more often, and as we built more fail-safes into the system and as we learned more about what we needed to do in ops, and as we invested more in simplifying and automating deployment and everything else that we could, we found that we didn't need time any outside of our regular iterations for hardening. We’re still doing hardening – but now this is part of the day-to-day job of building and releasing software.

Thursday, January 3, 2013

Classic Mistakes in Software Development and Maintenance

…the only difference between experienced and inexperienced developers is that the experienced ones realize when they’re making mistakes.
Jeff Atwood, Escaping from Gilligan’s Island

An important part of risk management, and responsible management at all, is making sure that you aren't doing anything obviously stupid. Steve McConnell’s list of Classic Mistakesis a place to start: a list of common basic mistakes in developing software and in managing development work, mistakes that are made so often, by so many people, that we all need to be aware of them.

McConnell originally created this list in 1996 for his book Rapid Development (still one of the best books on managing software development). The original list of 36 mistakes was updated in 2008 to a total of 42 common mistakes based on a survey of more than 500 developers and managers. The mistakes that have the highest impact, the mistakes that will most likely led to failure, are:

  1. Unrealistic expectations
  2. Weak personnel
  3. Overly optimistic schedules
  4. Wishful thinking
  5. Shortchanged QA
  6. Inadequate design
  7. Lack of project sponsorship
  8. Confusing estimates with targets
  9. Excessive multi-tasking
  10. Lack of user involvement

Most of the mistakes listed have not changed since 1996 (and were probably well known long before that). Either they’re fundamental, or as an industry we just aren't learning, or we don’t care. Or we can't find the time or secure a mandate to do things right, because of the relentless focus on short-term results:

Stakeholders won’t naturally take a long-term view: they tend to minimize the often extreme down-the-road headaches that result from the cutting of corners necessitated by the rush, rush, rush mentality. They’ll drive the car without ever changing the oil.
Peter Kretzman, Software development’s classic mistakes and the role of the CTO/CIO

The second most severe mistake that a development organization can make is to staff the team with weak personnel: hiring fast or cheap rather than holding out for people who have more experience and better skills, but who cost more. Although the impact of making this mistake is usually severe, it happens in only around half of projects – most companies aren't stupid enough to staff a development team with weak developers, at least not a big, high-profile project.

Classic Mistakes in Software Maintenance

But a lot of companies staff maintenance teams this way, with noobs and maybe a couple of burned out old-timers who are putting in their time and willing to deal with the demands of maintenance until they retire.

You get stuck in maintenance only if you are not good enough to work on new projects. After spending millions of dollars and many developer-years of effort on creating an application, the project is entrusted to the care of the lowest of the low. Crazy!
Pete McBreen, Software Craftsmanship

Capers Jones (Geriatric Issues of Ageing Software 2007, Estimating Software Costs 2008) has found that staffing a maintenance team with inexperienced people destroys productivity and is one of the worst practices that any organization can follow:

Worst Practice Effect on Productivity
Not identifying and cleaning up error-prone code – the 20% of code that contains 80% of bugs -50%
Code with embedded data and hard-coded variables – which contributes to “mass update” problems when this data changes -45%
Staffing maintenance teams with inexperienced people -40%
High complexity code that is hard to understand and change (often the same code that is error-prone) -30%
Lack of good tools for source code navigation and test coverage -28%
Inefficient or nonexistent change control methods -27%

Many of these mistakes are due to not recognizing and not dealing with basic code quality and technical debt issues, figuring out what code is causing you the most trouble and cleaning it up.

The rest are basic, obvious management issues. Keep the people who built the system and who understand it and know how and why it works working on it as long as you can. Make it worth their while to stay, give them meaningful things to work on, and make sure that they have good tools to work with. Find ways for them to work together efficiently, with each other, with other developers, with operations and with the customer.

These simple, stupid mistakes add up over time to huge costs, when you consider that maintenance makes up between 40% and 80% of total software costs. Like the classic mistakes in new development, mistakes in maintenance are obvious and fixable. We know we shouldn't do these things, we know what’s going to happen, and yet we keep doing them, over and again, and we're surprised when things fail. Why?

Tuesday, November 20, 2012

Predictability - Making Promises you can Keep

Speed – being first to market, rapid innovation and conducting fast cheap experiments – is critically important to startups and many high tech firms. This is where Lean Startup ideas and Continuous Deployment come in. And this is why many companies are following Agile development, to design and deliver software quickly and flexibly, incorporating feedback and responding to change.

But what happens when software – and the companies that build software – grow(s) up? What matters at the enterprise level? Speed isn't enough for the enterprise. You have to balance speed and cost and quality. And stability and reliability. And security. And maintainability and sustainability over the long term. And you have to integrate with all of the other systems and programs in your company and those of your customers and partners.

Last week, a group of smart people who manage software development at scale got together to look at all of these problems, at Construx Software’s Executive Summit in Seattle. What became clear is that for most companies, the most important factor isn’t speed, or productivity or efficiency – although everyone is of course doing everything they can to cut costs and eliminate waste. And it isn’t flexibility, trying to keep up with too much change. What people are focused on most, what their customers and sponsors are demanding, is predictability – delivering working software when the business needs it, being a reliable and trusted supplier to the rest of the business, to customers and partners.

Enterprise Agile Development and Predictability

Steve McConnell’s keynote on estimation in Agile projects kicked this off. A lot of large companies are adopting Agile methods because they’ve heard and seen that these approaches work. But they’re not using Agile out of the box because they’re not using it for the same reasons as smaller companies.

Large companies are adapting Agile and hybrid plan-based/Waterfall approaches combining upfront scope definition, estimating and planning, with delivering the project incrementally in Agile time boxes. This is not about discovery and flexibility, defining and designing something as you go along – the problems are too big, they involve too many people, too many parts of the business, there are too many dependencies and constraints that need to be satisfied. Emergent design and iterative product definition don’t apply here.

Enterprise-level Agile development isn’t about speed either, or “early delivery of value”. It’s about reducing risk and uncertainty. Increasing control and visibility. Using story points and velocity and release Burn Up reporting and evidence of working software to get early confidence about progress on the project and when the work will be done.

The key is to do enough work upfront so that you can make long-term commitments to the business – to understand what the business needs, at least at a high level, and estimate and plan this out first. Then you can follow Agile approaches to deliver working software in small steps, and to deal with changes as they come in. As McConnell says, it’s not about “responding to change over following a plan”. It’s having a plan that includes the ability to respond to change.

By continuously delivering small pieces of working software, and calibrating their estimates with real project data using velocity, a team working this way will be able to narrow the “cone of uncertainty” much faster – they’ll learn quickly about their ability to deliver and about the quality of their estimates, as much as 2x faster than teams following a fully sequential Waterfall approach.

There are still opportunities to respond to change and reprioritize. But this is more about working incrementally than iteratively.

Kanban and Predictability

Enterprise development managers are also looking at Kanban and Lean Development to manage waste and to maintain focus. But here too the value is in improving predictability, to smooth work out and reduce variability by finding and eliminating delays and bottlenecks. It’s not about optimization and Just-in-Time planning.

As David Anderson explained in his keynote on Delivering Better Predictability, Business Agility and Good Governance with Kanban, senior executives care about productivity, cost and quality – but what they care about most is predictability. The goal of a good software development manager is to be able to make a customer promise that their organization can actually meet.

You do this by keeping the team focused on the business of making software, and trying to drive out everything else: eliminating delays and idle time, cutting back administrative overhead, not doing work that will end up getting thrown away, minimizing time wasted in multi-tasking and context-switching, and not starting work before you’ve finished the work that you’ve already committed to. Anderson says that managers like to start on new work as it comes in because “starting gives your customer a warm comfortable feeling” – until they find out you’ve lied to them, because “we’re working on it” doesn’t mean that the work is actually getting done, or will ever get done. This includes fixing bugs – you don’t just fix bugs right away because you should, you fix bugs as they’re found because the work involved is smaller and more predictable than trying to come back and fixing them later.

Teams can use Kanban to dynamically prioritize and control the work in front of them, to balance support and maintenance requirements against development work and fixed date commitments with different classes of service, and limit Work in Progress (WIP) to shorten lead times and improve throughput, following the Theory of Constraints. This lets you control variability and improve predictability at a micro-level. But you can also use actual throughput data and Cumulative Flow reporting to project forward on a project level and understand how much work the team can do and when they will be done.

What’s interesting to me is seeing how the same ideas and methods are being used in very different ways by very different organizations – big and small – to achieve success, whether they are focused on fast iterations and responding to rapid change, or managing large programs towards a predictable outcome.

Wednesday, October 17, 2012

Should you care about Conway's Law?

Conway’s Law says that

“organizations which design systems (in the broad sense used here) are constrained to produce designs which are copies of the communication structures of these organizations.” [emphasis mine]

This was an assertion made in the 1960s based on a small study which has now become a truism in software development (it’s fascinating how much of what we do and think today is based on data that is 50 or more years old). There are lots of questions to ask about Conway’s Law. Should we believe it – is there evidence to support it? How important is the influence of the structure of the team that designed and built the system compared to the structure of the team that continued to change and maintain it for several years – are initial decisions more or less important? What happens as the organization structure changes over time – are these changes reflected in the structure of the code? What organization structures result in better code, or is it better to have no organization structure at all?

Conway's Law and Collective Code Ownership

Conway’s Law is sometimes used as an argument for a “Whole Team” approach and “Collective Code Ownership” in Agile development. The position taken is that systems that are designed by teams structured around different specializations are of lower quality (because they are artificially constrained) than systems built by teams of “specialized generalists” or “generalizing specialists” who share responsibilities and the code (in small Scrum teams for example).

Communications Structure and Seams

First it is important to understand that the argument in Conway’s Law is not necessarily about how organizations are structured. It is about how people inside an organization communicate with each other – whether and how they talk to each other and share information, the freedom and frequency and form, is communication low-bandwidth and formal/structured, or high-bandwidth and informal. It’s about the “social structure” of an organization.

There are natural seams that occur in any application architecture, as part of decomposition and assignment of responsibilities (which is what application architecture is all about). Client and server separation (UI and UX work is quite different from what needs to be done on the server, and is often done with completely different technology), API boundaries with outside systems, data management, reporting, transaction management, workflow. Different kinds of problems that require different skills to solve them.

The useful argument that Conway’s Law makes is that unnatural seams, unnecessary complexity, misunderstandings and disconnects will appear in the system where people don’t communicate with each other effectively.

Conway’s Corollary

Much more interesting is what Conway’s Law means to how you should structure your development organization. This is Conway’s Corollary:

“A software system whose structure closely matches its organization’s communication structure works better (defined broadly) than a subsystem who structure differs from its organization’s communication structure.”
“Better” means higher productivity for the people developing and maintaining the system, through more efficient communication and coordination, and higher quality.

In Making Software, Christian Bird at Microsoft Research (no relation) explains how important it is that an organization’s “social structure” mirrors the architecture of the system that they are building or working on. He walks through a study on the relationship between development team organization structure and post-release defects, in this case the organization that built Microsoft Windows Vista. This was a very large project, with thousands of developers, working on tens of millions of LOC. The study found that organization structure was a better indicator of software quality than any attributes of the software itself. The more complex the organization, the more coordination required, the more chances for bugs (obvious, but worth verifying). What is most important is “geographic and structural congruence” – work that is related should be done by people who are working closely together (also obvious, and now we have data to prove it).

Conway's Corollary and Collective Code Ownership

Conway’s Corollary argues against the “Collective Code Ownership” principle in XP where everyone can and should work on any part of the code at any time. The Microsoft study found that where developers from different parts of the organization worked on the same code, there were more bugs. It was better to have a team own a piece of code, or at the very least act as a gatekeeper and review all changes. Work is best done by the people (or person) who understand the code the most.

Making Organizational Decisions

A second study of 5 OSS projects was also interesting, because it showed that even in Open Source projects, people naturally form teams to work together on logically related parts of a code base.

The lessons from Conway's Corollary are that you should delay making decisions on organization until you understand the architectural relationships in a system; and that you need to reorganize the team to fit as the architecture changes over time. Dan Pritchett even suggests that that if you want to change the architectural structure of a system, you should start by changing the organization structure of the team to fit the target design – forcing the team to work togeter to “draw the new architecture out of the code”.

Conway’s Law is less important and meaningful than people believe. Applying the argument to small teams, especially co-located Agile teams where people are all working closely together and talking constantly, is effectively irrelevant.

Conway’s Corollary however is valuable, especially for large, distributed development organizations. It’s important for managers to ensure that the structure of the team is aligned with the architectural structure of the system – the way it is today, or the way you want it to be.