Thursday, July 18, 2013

Agile Development leads to Alzheimer's

Iterative development and design helps you to reach your way towards understanding what the customer really needs, to try out new ideas, evaluate designs, experiment, respond to feedback and react to changing circumstances. Everything gets better as you learn more about the domain and about the customer and about the language and technologies that you are using. This is important early in development, and just as important later as the product matures and in maintenance where you are constantly tuning and fixing things and dealing with exceptions.

But there are downsides as well. Iterative development erodes code structure and quality. Michael Feathers, who has been studying different code bases over time, has found that changes made iteratively to code tend to bias more towards the existing structure of the code, that developers make more compromises working this way. Code modules that are changed often get bigger, fatter and harder to understand.

Working iteratively you will end up going over the same ground, constantly revisiting earlier decisions and designs, changing the same code over and over. You’re making progress – if change is progress – but it’s not linear and it’s not clean. You’re not proceeding in a clear direction to a “right answer” because there isn’t always a right answer. Sometimes you go backwards or in circles, trying out variants of old ideas and then rejecting them again, or just wandering around in a problem space trying stuff until something sticks. And then somebody new comes in who doesn’t understand or doesn’t like the design, tries something else, and leaves it for the next guy to pick up. Changes in design, false starts, dead ends and flip flops leave behind traces in the code. Even with constant and disciplined refactoring, the design won’t be as clean or as simple as it would be if you “got it right the first time”.

It doesn’t just wear down the code, it wears down the team too

Iterative development also has an erosive effect on an organization’s memory – on everyone’s understanding of the design and how the system works. For people who have been through too many changes in direction, shifts in priorities and back tracking, it’s difficult to remember what changed and when, what was decided and why, what design options where considered and why they were rejected before, what exceptions and edge cases came up that needed to be solved later, and what you need to know when you’re trying to troubleshoot a problem, fixing a bug or making another design change.

Over the course of the last 6 or more years we've changed some ideas and some parts of the code a dozen times, or even dozens of times, sometimes in small, subtle but important ways, and sometimes in fundamental ways. Names stay the same, but they don’t mean what they used to.

The accumulation of all of these decisions and changes in design and direction muddies things. Most people can keep track of the main stories, the well-used main paths through the system. But it’s easy for smart people who know the design and code well, to lose track of details, the exception paths and dependencies, the not-always-logical things that were done for one important customer just because 25 or 50 or 110 releases ago. It gets even more confusing when changes are rolled out incrementally, or turned on and off in A/B testing, so that the system behaves differently for different customers at different times.

People forget or misremember things, make wrong assumptions. It’s hard to troubleshoot the system, to understand when a problem was introduced and why, especially when you need to go back and recreate a problem that happened in the past. Or when you’re doing trend analysis and trying to understand why user behaviour changed over time – how exactly did the system work then? Testers miss bugs because they aren't clear about the impact of a change, and people report bugs – and sometimes even fix bugs – that aren't bugs, they've just forgotten what is supposed to happen in a specific case.

When making changes iteratively and incrementally, people focus mostly on the change that they are working on now, and they forget or don’t bother to consider the changes that have already been made. A developer thinks they know how things work because they’ve worked on this code before, but they forget or don’t know about an exception that was added in the past. A tester understands what needs to be tested based on what has just been changed, but can’t keep track of all of the compatibility and regression details that also need to be checked.

You end up depending a lot on your regression test suite to capture the correct understanding of how the system really works including the edge cases, and to catch oversights and regression mistakes when somebody makes a fix or a change. But this means that you have to depend on the people who wrote and maintained the tests and their understanding and their memory of how things work and what impact each change has had.

Iterative development comes with costs

It’s not just the constant pace, the feeling of being always-on, always facing a deadline that wears people down over time. It’s also the speed of change, the constant accumulation of small decisions, and reversing or altering those decisions over and over that wears down people’s understanding, that wears down the mental model that everyone holds of how the system works and how the details tie together. All of this affects people’s accuracy and efficiency, and their confidence.

I am not sure that there is a way to avoid this. Systems, teams, people all age, and like in real life, it’s natural that people will forget things. The more changes that you make, the more chances there are for you to forget something.

Writing things down isn't much of a help here. The details can all be found somewhere if you look: in revision history, in documentation, in the test suite and in the code. The problem is more with how people think the system works than it is with how the system actually works; with how much change people can keep up with, can hold in their heads, and how this affects the way they think and the way they work.

When you see people losing track of things, getting confused or making mistakes, you need to slow down, review and reset. Make sure that before people try to fix or change something they have a solid understanding of the larger design – that they are not just focusing on the specific problem they are trying to solve. Two heads are better than one in these cases. Pair people up: especially developers and testers together, to make sure that they have a consistent understanding of what a change involves. Design and code reviews too, to make sure that you’re not relying too much on one person’s memory and understanding. Just like in real life, as we get older, we need to lean on each other a bit more.

Friday, May 7, 2010

Why isn't Risk Management included in Scrum?

There are a lot of fundamentally good ideas in Scrum, and a lot of teams seem to be having success with it, on more than trivial projects. I’m still concerned that there are some serious weaknesses in Scrum, especially “out of the box”, where Scrum leaves you to come up with your own engineering framework, asks you to come up with your own way to build good software.

I am happy to see that recent definitions (or reinterpretations) of Scrum, for example in Mike Cohn’s book Succeeding with Agile Software Development Using Scrum incorporate many of the ideas from Extreme Programming and other basic good management and engineering practices to fill in some of the gaps.

But I am not happy to see that risk management is still missing in Scrum. There is no discussion of risk management in the original definition of Scrum, or in the CSM training course (at least when I took it), the latest Scrum Guide (although with all of the political infighting in the Scrum community, I am not sure where to find the definitive definition if such a thing exists any more), not even in Mike Cohn’s new book.

I just don’t understand this.

I manage an experienced development and delivery team, and we follow an incremental, iterative development approach based on Scrum and XP. These are smart, senior people who understand what they are doing, they are talented and careful and disciplined, and we have good tools and we have a lot of controls built in to our SDLC and release processes. We work closely with our customer, we deliver software often (every 2-3 weeks to production, sometimes faster), we continuously review and learn and get better. But I still spend a lot of my time watching out for risks, trying to contain and plan for business and technical and operational risks and uncertainties.

Maybe I worry too much (some of my colleagues think so). But not worrying about the risks won’t make them go away. And neither will following Scrum by itself. As Ken Schwaber, one of the creators of Scrum, admits:
“Scrum purposefully has many gaps, holes, and bare spots where you are required to use best practices – such as risk management.”
My concern is that this should be made much more clear to people trying to follow the method. The contrast between Extreme Programming and Scrum is stark: XP confronts risk from the beginning, and the idea and importance of managing project and technical risks is carried throughout XP. Kent Beck, and later others including Martin Fowler, examine the problems of managing risk in building software, prioritizing work to take into account both business value and technical risk (dealing with the hard problems and most important features as early as possible), and outlining a set of disciplines and controls that need to be followed.

In Scrum, some management of risks is implicit, essentially burned-in to the approach of using short time-boxed sprints, regular meetings and reviews, more efficient communications, and a self-managing team working closely with the customer, inspecting and adapting to changes and new information. I definitely buy into this, and I’ve seen how much risk can be managed intrinsically by a good team following incremental, iterative development.

As I pointed out earlier, Scrum helps to minimize scope, schedule, quality, customer and personnel risks in software development through its driving principles and management practices.

But this is not enough, not even after you include good engineering practices from XP and Microsoft’s SDL and other sources. Some leaders in the Agile community have begun to recognize this, but there is an alarming lack of consensus within the community on how risks should be managed:

- by the team, intrinsically: like any other requirement or issue, members of the self-managing team will naturally recognize and take care of risks as part of their work. I’m not convinced that a development team is prepared to naturally manage risks, even an experienced team – software development is an essentially an optimistic effort, you need to believe that you can create something out of nothing, and most of the team’s attention will naturally be on what they need to do and how to best get it done rather than trying to forecast what could go wrong and how to prepare for it;

- by the team, explicitly: the team owns risk management, they are responsible for identifying and managing risks using a risk management framework (risk register, risk assessment and impact analysis, and so on);

- by the ScrumMaster, as another set of issues to consider when coaching and supporting the team, although how the ScrumMaster then ensures that risks are actually addressed is not clear, since they don’t control what work gets done and when;

- by the Product Owner: this idea has a lot of backing, supposedly because the Product Owner acting for the customer in the end understands the risk of failure to the business best. The real reason is because the team can resign themselves of the responsibility for risk management and hand it off to the customer. This makes me angry. It is unacceptable to suggest that someone representing the customer should be made responsible for assuming the risk for the project. The customer is paying your organization to do a job, and naturally expecting you as the expert to do this job professionally and competently. And yet you are asking this same customer to take responsibility for the risk that the project won’t be delivered successfully? Try selling that to any of the enterprise customers that I have worked with over the past 15 years…

Risk management for a Scrum project needs to take this into account, and take into account all of the risks and issues that are external to the project team:

- the political risks involved in the team’s relationship with the Product Owner, and the Product Owner’s position and influence within their own organization. Scrum places too much responsibility on the Product Owner and requires that this person is not only competent and committed to the project and deeply understands the needs of the business; but that they also always put the interests of the business ahead of their own, and of course this assumes that they are not in conflict with other important customer stakeholders over important issues. They also need to understand the importance of technical risk, and be willing to trade-off technical risk for business value in planning and scheduling work in the backlog. I am lucky in that I have the opportunity to work with a Product Owner who actually meets this profile. But I know how rare and precious this is;

- the political risks of managing executive sponsors and other key stakeholders within the customer and within your own organization - it's naive to think that delivering software regularly and keeping the Product Owner happy is enough to keep the support of key sponsors;

- financial and legal risks – making sure that the project satisfies the legal and business conditions of the contract, dealing with intellectual property and confidentiality issues, and financial governance;

- subcontractors and partners – making sure that they are not going to disappoint or surprise you, and that you are meeting your commitments to them;

- infrastructure, tooling, environmental factors – making sure that the team has everything that they need to get the job done properly;

- integration risks with other projects - requirements for program management, coordinating and communicating with other teams, managing interdependencies and resource conflicts, handling delays and changes between projects;

- rollout and implementation, packaging, training, marketing – managing the downstream requirements for distribution and deployment of the final product.

So don’t throw out that PMP.

It’s clear that you need real and active project management and risk management on Scrum projects, like any project: focused not so much inwards, but outwards. So much of what you read about Scrum, and Agile project management generally, is naive in that it assumes that the development work is being done in a vacuum, that there is nothing that concerns the project outside the immediate requirements of the development team. Even assuming that the team is dealing effectively with technical risks, and that other immediate delivery risks are contained by being burned-in to doing the work incrementally and following engineering best practices, you still have to monitor and manage the issues outside of the development work, the larger problems and issues that extend beyond the team and the next sprint, the issues that can make the difference between success and failure.

Thursday, April 22, 2010

XP and the Art of Software Maintenance

Most of us in software development will spend most of our careers maintaining and supporting software, not just working on new, greenfield projects. Maintenance is brownfield work, it’s hard work under difficult and sometimes unfair conditions and strict constraints. It’s not glamorous, and it takes discipline and skill and commitment to succeed over the long term.

There are a number of challenges in successfully maintaining a system, especially a big business-critical system, a system that has been around for a while, that represents the work of many people over many years.

There are the technical challenges in safely managing change, minimizing technical and operational risk, recognizing and containing technical debt, understanding and working with code that you did not have a hand in writing (and whose author has long left the company), testing and installing upgrades to ensure that the technology stack does not become obsolete, and keeping up with the changing security threat landscape. Setting and maintaining a high level of quality, continuously reviewing and refactoring the design and implementation, ensuring that you don’t let entropy set in and fall into the trap of having to re-write the system and lose all of the work that has already been done – what Joel Spolsky calls “the single worst strategic mistake that any software company can make”.

And there are challenges in managing the team, keeping the strongest possible team together for as long as possible, sustaining momentum and commitment and engagement over time, making the work interesting and worthwhile and important and fun.

As I described in a previous post Everything I needed to know about Maintenance, I learned how a company could be successful over a long period of time maintaining and supporting the same software, continuously focusing on delivering new value to customers and pushing for technical excellence, all done by a small senior team following an incremental development approach. I have tried to apply these ideas at my current firm, where we have been supporting and maintaining a business-critical financial application for more than 3 years now.

Many of these same ideas and practices, and more, are captured in today’s agile development methods: XP, in particular, is an engineering and management framework that is especially well-suited for software maintenance. XP provides a foundation for maintenance through:

Frequent, small releases to production: always be delivering, creating a sense of accomplishment for the team and continuously delivering value to the customer, responding to change, and learning from feedback.

A constant focus on quality: “No defect is acceptable, each is an opportunity for the team to learn and improve”.

Making change safe through automated developer testing, building a regression safety net.

Continuous integration: always knowing that the code works.

Close contact with the customer (the business side and operations both).

Lightweight, continuous communications, with just enough documentation.

Refactoring: constantly improving code and design – critical in recognizing and reducing technical debt.

Slack and sustainable pace: giving people time to do their work, preventing burnout, and ensuring that you can fit in other work demands, especially important in maintenance because you can’t control requirements for support and firefighting.

Collective code ownership, skilling-up and skilling-out the team: in maintenance, by necessity sooner or later just about everyone is going to touch just about every piece of code.

Just enough design, breaking problems down and finding the simplest possible solution – this is a controversial aspect of XP when building enterprise systems from scratch, but it is the right approach in maintenance where you are dealing with incremental problems and the constraints of existing architecture and technology.

Transparency and respect – creating and maintaining an open, trusting and respectful environment within the team, with operations and with the customer.

Now, in our case, I don’t mean 100%, full-on, hardcore, literally by-the-book XP: I mean a dialed-down implementation of Extreme Programming, a less-Extreme Extreme Programming. As Kent Beck states in Extreme Programming Explained: Embrace Change
"The values, principles and practices are there to provide guidance, challenge and accountability… The goal is successful and satisfying relationships and projects, not membership in the ‘XP Club’."
We have followed his guidance, to
“Experiment with XP using these practices as your hypotheses”
and we have adapted the ideas and principles of XP to our situation, our experience and way of working.

XP, by Kent Beck’s admission, is an integrated set of good engineering and management practices, dialed up to 10. In adapting and integrating the practices in XP for maintenance, we have dialed back in specific areas:

Pair Programming

All of our code changes are reviewed before being released. The idea behind pairing is that if code reviews are good, continuous code reviews are better. Like my friend Pete McBreen in his post Still Questioning Extreme Programming I think that pairing makes sense in specific cases, especially in troubleshooting and helping people new to the team, but it is not necessary all the time – our developers pair up when it makes sense.

Test First Development

We rely extensively on automated testing, testing early and testing often. Our developers choose to follow TFD or TDD practices, or write tests after the code is written, as they see fit, following the principle that
“code and testing can be written in either order… write tests in advance when possible”.
We put a lot of emphasis on testing, on automating developer testing – this is another area where XP is in agreement:
“in XP testing is as important as programming”.
This is a critical idea in maintenance, where even small changes to an existing system can have significant consequences.

Unlike some “pure” XP teams, we don’t rely only on the automated test suites: we have a senior team of testing specialists who conduct exploratory and destructive testing, system and integration testing, operational testing; we schedule regular application penetration tests; we run system trials and simulations with the team involved in interactive, loosely structured “war games”; and we take advantage of technologies such as static analysis in our Continuous Integration environment. Our automated regression testing safety net is an important asset, but we find valuable, higher-risk problems in exploratory testing, reviews and in the war games simulations.

Incremental Delivery

We follow a model closer to the first edition description of XP, releasing to production every 2-3 weeks rather than holding to a 1-week cycle – extremely short, rapid cycling isn’t sustainable, and doesn’t allow enough time for the reviews and other checkpoints that we have found necessary and valuable.

The Development/Maintenance Problem

In many organizations there are “developers” and “maintainers”: a team of hotshots is hired to design and build the initial system, and once the “hard work” is done, they hand it off to the maintenance and support or “sustained engineering” crew: kids and old-timers and other misfits who don’t have what it takes (yet, or any more) to do “real software development”; or the work of maintenance and support is offshored to a team in India or Eastern Europe to save costs.

But this is not the case in XP, as Pete McBreen points out in Questioning Extreme Programming
"The interesting thing about XP, however, is that it assumes that applications are never really going to be handed off to a separate maintenance team. The assumption is that after each incremental release, the customer will want more functionality and keep funding the development team… As such, there is never a need to hand the application over to a maintenance team; the original development team can continue to support the application indefinitely”.
This idea of keeping the team together, preserving the knowledge that has been built up over time, the team’s deep and shared understanding of the domain, their proven ability to deliver, is critical and fundamental. This is the real intellectual property, the real value that you have created. Erich Brechner at Microsoft explores this in his post on Sustained engineering idiocy where he shows that keeping the development team engaged in maintenance and support builds accountability, creates a deeper understanding of the system and of the customer’s needs, and informs future development, using the feedback from support to improve the quality and reliability of future releases or future products. Eric provides some useful ideas on how to balance the requirements of maintenance and support against future development: structuring your team around a core with an evaluation team that investigates and triages issues, and using backlog management to feed fixes into the incremental development schedule.

Most of the work that will be done on a piece of software, up to 70% in some studies, is done during maintenance. It just makes sense to have your best people working on what is most important: protecting the investment that you and your customer made in building the software in the first place; supporting the ongoing business operations of your customers; and ensuring that you and your customers will continue to succeed in the future.

Saturday, October 17, 2009

The real cost of software security

There has been a lot of discussion in the blogosphere over the last few months on costs and ROI justifications for building secure software. Back in July, I responded to a post by Jeremiah Grossman, CTO at White Hat Software, which examined the end-to-end costs of software security, whether and how upfront investments in a secure SDLC mitigate downstream security costs and risks: a classic “pay me now or pay me (much more) later” problem. In my response to Jeremiah’s analysis, I tried to break out the costs of building secure software: what I now think of as direct, “hard” pure security costs, compared to indirect, "soft" supporting costs, the costs of building software properly in the first place. From a budgeting and ROI perspective, it is important to break out the costs of building software correctly in the first place, the foundational practices, from real security costs.

An effective software security program has to rely on a foundation of software quality management practices and governance. Your quality management program can be lightweight and agile, but if you are hacking out code without care for planning, risk management, design, code reviews, testing, incident management then what you are trying to build is not going to be secure. Period. Coming from a software development background, I feel that the security community is trying to take on too much of the responsibility, and too much of the costs, for ensuring that basic good practices are in place.

But it’s more than that. If you are doing risk management, design reviews, code reviews, testing, change and release management, then adding security requirements, perspectives, controls to these practices can be done simply, incrementally, and at a modest cost:
  1. Risk management: add security risk scenarios, threat assessment to your technical risk management program.
  2. Design reviews: add threat modeling where it applies, just as you should add failure mode analysis for reliability.
  3. Code reviews: first you can argue, as I did earlier in my response, that a significant number of security coding problems are basic quality problems, simply a matter of writing crappy code: poor or missing input validation (a reliability problem, not just a security problem), lousy error handling (same), race conditions and deadlocks (same), and so on. If making these kinds of mistakes a security problem (and a security cost) helps get programmers to take them seriously, then go ahead, but it shouldn’t be necessary. So what you are left with are the costs of dealing with “hard” security coding problems, like improper use of crypto, secure APIs, authentication and session management, and so on.
  4. Static analysis: as I argued in an earlier post on the value of static analysis, static analysis checks should be part of your build anyways. If the tools that you use, like Coverity or Klocwork, check for both quality and security mistakes, then your incremental costs are in properly configuring the tools and understanding, and dealing with, the results for security defects.
  5. Testing: security requirements need to be tested along with other requirements, on a risk basis. Regression tests, boundary and edge tests, stress tests and soak tests, negative destructive tests (thinking like an attacker), even fuzzing should be part of your testing practices for building robust and reliable software anyways.
  6. Change management and release management: ensure that someone responsible for security has a voice on your change advisory board. Add secure deployment checks and secure operations instructions to your release and configuration management controls.
  7. Incident management: security vulnerabilities should be tracked and managed as you would other defects. Handle security incidents as “level 1” issues in your incident management, escalation, and problem management services.
So what are the direct costs of a software security program? Looking over my own budget, these are the major cost items that I can find:
  1. Training managers, architects, developers, testers on security concepts, issues, threats, practices. You need to invest in training upfront, and then refresh the team: Microsoft’s SDL requires that technical staff be retrained annually, to make sure that the team is aware of changes to the threat landscape, to attack bad habits, to reinforce good ones.
  2. As I described in an earlier post on our software security roadmap , we hired expert consultants to conduct upfront secure architecture and code reviews, to help define secure coding practices, and to work with our architects and development manager to plan out a roadmap for software security. Paying for a couple of consulting engagements was worthwhile and necessary to kickstart our software security program and to get senior technical staff and management engaged.
  3. Buying “black box” vulnerability scanning tools like IBM Rational Appscan and Nessus, and the costs of understanding and using these tools to check for common vulnerabilities in the application and the infrastructure.
  4. Penetration testing: hiring experts to conduct penetration tests of the application a few times per year, to check that we haven’t got sloppy and missed something in our internal checks, tests and reviews, and to learn more about new attacks.
  5. Some extra management and administrative oversight of the security program, and of suppliers and partners.
The other incremental costs of building secure software, like the costs for building robust and reliable software, are now effectively burned in to our SDLC, into how we plan, design, build, test, deploy and support software. I could break out the incremental cost burden of these security practices and controls, but the costs would be modest - most of the cost, and the work, is in building software properly. And by following an incremental, optimizing approach, starting small and continuously reviewing and improving, not only are upfront costs for a software security program reduced, but the ROI is realized much faster. If you set your quality bar high enough, the real costs of secure software are surprisingly low.

Sunday, September 27, 2009

Risk Management - You Don't Have to Waltz with Bears

I recently finished reading Waltzing with Bears: Managing Risk on Software Projects by Tom DeMarco and Tim Lister, both recognized experts in software development and risk management. The material in this book covers much of the same territory as courses that I attended several years ago in software project management and risk management presented by these authors through The Atlantic Systems Guild.

This work is based on their experience as consultants and as expert witnesses in contract disputes and litigation over software project failures. The authors make a strong case that effective risk management is essential to the success of any software project worth doing; that you must be prepared to face failure and deal with uncertainty; that you must actively manage risks, by containing risks through schedule and budget buffers, or proactively mitigating risks by taking steps to reduce the probability and/or impact of a problem; that you must consider alternatives for any critical activities or work items; and that managing for success, attempting to evade risks, is the path to failure.

Waltzing with Bears focuses on the kinds of problems faced by (and effectively created by) large waterfall projects: trying to commit to scope and schedule and cost up front when there isn’t enough information to do so; and trying to account for and manage the unknown and unaccountable. It’s an almost hopeless situation, but the authors provide ideas and disciplines and tools that at least offer a better chance at success.

What’s necessary is to change the rules of the game, to consider other ways of building software.

In an earlier post, I explored how risk management can and should be burned into the way that you develop software; how schedule and scope and quality risks and other risks can be managed through the development lifecycle you choose and the engineering practices that your team follows. Johanna Rothman, in a paper titled “What Lifecycle: Selecting the Right Model for your Project” explores some of the same ideas, how to manage schedule risks and other risks through lifecycle models, in particular incremental and iterative development approaches.

It is clear to me that following incremental, iterative, timeboxed development, as in Extreme Programming and Scrum, will effectively mitigate many of the common risks and issues that concern the authors of Waltzing with Bears. To some extent, the authors agree, when they conclude that

“The best bang-per-buck risk mitigation strategy we know is incremental delivery” (by which they mean Staged Delivery), “development of a full or nearly full design, and then the implementation of that design in subsets, where each successive subset incorporates the ones that preceded it”.

While Scrum (interestingly) does not explicitly address risk management; it does mitigate scope, schedule, quality, customer and personnel risks through its driving principles and management practices: incremental timeboxed delivery (sprints), close collaboration within a self-managing team and with the customer, managing the backlog (scope) together with the customer (Product Owner), and daily standup meetings and retrospectives which allow the team to continuously adjust to issues and changes.

Extreme Programming (XP) recognizes and confronts risk directly and fundamentally – chapter 1 of Extreme Programming Explained: Embrace Change begins:

“The basic problem of software development is risk”.

In The Case for XP Chris Morris explains that XP is resilient to risk, that it inherently accepts change and uncertainty, rather than attempting to anticipate risk, to predict and manage dangers up front; building on a risk management model developed by political scientist Aaron Wildavsky.

XP addresses risk through:

- short iterations with fine-grained feedback

- keeping the customer close

- test-driven development to maintain a quality baseline

- refactoring and pair programming to ensure code quality

- continuous integration

- simple design

While you can manage most types of risks effectively through your SDLC especially by following incremental, iterative techniques and disciplined engineering practices, there are two general classes of risk that require active and continuous risk discovery and explicit risk management, using tools and ideas such as the ones detailed in Waltzing with Bears, Steve McConnell’s Top 10 Risk List, and the formal methods and techniques taught by the Project Management Institute (this is where my PMP comes in handy):

1. Project risks outside of your team’s work in software development, but which directly impact your success. These include: sponsor and stakeholder issues and other political risks, larger business issues outside of your control, regulatory changes, reliance on delivery from partners and sub-contractors, implementation and integration with partners and customers.

2. Technical risks in the platform, architecture or design. This is especially important if you are building enterprise, high reliability systems such as a telco, banking systems, large e-commerce sites, or financial trading. Some lifecycle and SDLC factors help to mitigate technical risks, such as prioritizing work that is technically difficult in XP, or using exploratory prototyping not only for customer feedback but for technical proof of concept work. But to ensure that your product works in the real world, the team constantly needs to consider technical risk: difficult problems to solve; fragile or complex parts of the system; areas where you are pushing beyond your technical knowledge and experience. Using this information you can determine where to focus your attention in technical reviews and testing; what to try early and prove out; what to let soak; what you should have your best people work on.

If you are building software incrementally and carefully, you won’t have to “waltz with bears”, but you still need to continuously look for, and actively manage, risks inside and outside of the work that your team is doing.

Wednesday, June 17, 2009

How long can this go on?

Our team delivers software iteratively and incrementally, and over the past 3 years we have experimented with longer (1-2 months) and shorter (1-2 week) iterations, adjusting to circumstances, looking for the proper balance between cost and control.

There are obvious costs in managing an iteration: startup activities (planning, prioritization, kickoff, securing the team's commitment to the goals of the release), technical overheads like source code and build management (branching and merging and associated controls), status reporting to stakeholders, end-to-end system and integration testing, and closure activities (retrospectives, resetting). We don’t just deliver “ship-quality” software at the end of an iteration: in almost every case we go all the way to releasing the code to production, so our costs also include packaging, change control, release management, security and operations reviews, documentation updates and release notes and training, certifications with partners, data conversion, rollback testing, and pre- and post-implementation operations support. Yep, that’s a lot of work.

All of these costs are balanced against control: our ability to manage and contain risks to the project, to the product, and to the organization. I explored how to manage risks through iterative, incremental development in an earlier post on risk management.

We’ve found that if an iteration is too long (a month or more), it is hard to defend the team from changes to priorities, to prevent new requirements from coming in and disrupting the team’s focus. And in a longer cycle, there are too many changes and fixes that need to be reviewed and tested, increasing the chance of mistakes or oversights or regressions.

Shorter releases are easier to manage because, of course, they are necessarily smaller. We can manage the pressure from the business-side for changes because of the fast delivery cycle (except for emergency hot fixes, we are usually able to convince our product owner, and ourselves, to wait for the next sprint since it is only a couple of weeks away) and it is easier for everyone to get their heads around what was changed in a release and how to verify it. And shorter cycles keep us closer to our customers, not only giving us faster feedback, but demonstrating constant value. I like to think of it as a “value pipeline”, continuously streaming business value to customers.

One of my favorite books on software project management, Johanna Rothman’s Manage It!, recommends making increments smaller to get faster feedback – feedback not just on the product, but on how you build it and how you can improve. The smaller the iteration, the easier to look at it from beginning-to-end and see where time is wasted, what works, what doesn’t, where time is being spent that isn’t expected.

“Shorter timeboxes will make the problems more obvious so you can solve them.”

Ms. Rothman recommends using the “Divide-by-Two Approach to Reduce Iteration Size”: if the iterations aren’t succeeding, divide the length in half, so 6 weeks becomes 3 weeks, and so on. Smaller iterations provide feedback - longer ones mask the problems.

Ms. Rothman also says that it is difficult to establish a rhythm for the team if iterations are too long. In “Selecting the Right Iteration Length for Your Software Development Process”, Mike Cohn of Mountain Goat Software examines the importance of establishing a rhythm in incremental development. He talks about the need for a sense of urgency: if an iteration is too long, it takes too much time for the team to “warm up” and take things seriously. Of course, this needs to be balanced against keeping the team in a constant state of emergency, and burning everyone out.

Some of the other factors that Mr. Cohn finds important in choosing an iteration length:
- how long can you go without introducing change – avoiding requirements churn during an iteration.
- if cycles are too short (for example, a week) small issues, like a key team member coming down with a cold, can throw the team’s rhythm off and impact delivery.

All of this supports our experience: shorter (but not too-short) cycles help establish a rhythm and build the team’s focus and commitment, constantly driving to delivering customer value. And shorter cycles help manage change and risk.

Now we are experimenting with an aggressive, fast-tracked delivery model: a 3-week end-to-end cycle, with software delivered to production every 2 weeks. The team starts work on designing and building the next release while the current release is in integration, packaging and rollout, overlapping development and release activities. Fast-tracking is difficult to manage, and can add risk if not done properly. But it does allow us to respond quickly to changing business demands and priorities, while giving us time for an intensive but efficient testing and release management process.

We'll review how this approach works over the next few months and change it as necessary, but we intend to continue with short increments. However, I am concerned about the longer-term risks, the potential future downsides to our rapid delivery model.

In The Decline and Fall of Agile James Shore argues that rapid cycling short cuts up-front design:

“Up-front design doesn't work when you're using short cycles, and Scrum doesn't provide a replacement. Without continuous, incremental design, Scrum teams quickly dig themselves a gigantic hole of technical debt. Two or three years later, I get a call--or one of my colleagues does. "Changes take too long and cost too much!" I hear. "Teach us about test-driven development, or pairing, or acceptance testing!" By that time, fixing the real problems requires paying back a lot of technical debt, and could take years.”

While Mr. Shore is specifically concerned about loose implementations of Scrum, and its lack of engineering practices compared with other approaches like XP (see also Martin Fowler of ThoughtWorks on the risks of incremental development without strong engineering discipline), the problem is a general one for teams working quickly, in short iterations: even with good engineering discipline, rapid cycling does not leave a lot of time for architecture, design and design reviews, test planning, security reviews... all of those quality gating activities that waterfall methods support. This is a challenge for secure software development, as there is little guidance available on effectively scaling software security SDLC practices to incremental, agile development methods, something that I will explore more later.

Trying to account for architecture and platform decisions and tooling and training in an upfront “iteration zero” isn’t enough, especially if your project is still going strong after 2 or 3 years. What I worry about (and I worry about a lot of things) is that, moving rapidly from sprint to sprint, the team cannot stop and look at the big picture, to properly re-assess architecture and platform technology decisions made earlier. Instead all the team has a chance to do is make incremental, smaller-scale improvements (tighten up the code here, clean up an interface there, upgrade some of the technology stack), which may leave fundamental questions unanswered, trading off short-term goals (deliver value, minimize the cost and risk of change) with longer-term costs and uncertainties.

One of the other factors that could affect quality in the longer term is the pressure on the team to deliver in a timebox. In Technical Debt: Warning Signs, Catherine Powell raises the concern that developers committing to a date may put schedule ahead of quality:

“Once you've committed to a release date and a feature set, it can be hard to change. And to change it because you really want to put a button on one more screen? Not likely. The "we have to ship on X because X is the date" mentality is very common (and rightly so - you can't be late forever because you're chasing perfection). However, to meet that date you're likely to cut corners, especially if you've underestimated how much time the feature really takes, or how much other stuff is going on.”

Finally, I am concerned that rapid cycling does not give the team sufficient opportunities to pause, to take a breath, to properly reset. If they are constantly moving heads down from one iteration to another, do team members really have a chance to reflect, understand and learn? One of the reasons that I maintain this blog is exactly for this: to explore problems and questions that my team and I face; to research, to look far back and far ahead, without having to focus on the goals and priorities of the next sprint.

These concerns, and others, are explored in Traps & Pitfalls of Agile Development - a Non-Contrarian View:

"Agile teams may be prone to rapid accumulation of technical debt. The accrual of technical debt can occur in a variety of ways. In a rush to completion, Iterative development is left out. Pieces get built (Incremental development) but rarely reworked. Design gets left out, possibly as a backlash to BDUF. In a rush to get started building software, sometimes preliminary design work is insufficient. Possibly too much hope is placed in refactoring. Refactoring gets left out. Refactoring is another form of rework that often is ignored in the rush to complete. In summary, the team may move too fast for it's own good."

Our team’s challenge is not just to deliver software quickly: like other teams that follow these practices, we’ve proven that we can do that. Our challenge is to deliver value consistently, at an extremely high level of quality and reliability, on a continual and sustainable basis. Each design and implementation decision has to be made carefully: if your customer's business depends on you making changes quickly and perfectly, without impacting their day-to-day operations, how much risk can you afford to take on to make changes today so that the system may be simpler and easier to change tomorrow, especially in today's business environment? It is a high stakes game we're playing. I recognize that this is a problem of debt management, and I'll explore the problems of technical debt and design debt more later.

The practices that we have followed have worked well for us so far. But is there a point where rapid development cycles, even when following good engineering practices, provide diminishing returns? When does the accumulation of design decisions made under time pressure, and conscious decisions to minimize the risk of change, add up to bigger problems? Does developing software in short cycles, with a short decision-making horizon, necessarily result in long-term debt?

Monday, March 23, 2009

What's Wrong with Sucking Less?

At the Agile 2008 conference in Toronto, David Douglas & Robin Dymond discussed their concerns that the majority of companies who adopt agile (and by “agile”, effectively meaning Scrum) practices were falling short of complete adoption. The companies that they were working with were satisfied with 1.5-2x performance improvements in quality and time-to-market gained by effectively cherry picking from the key agile, incremental software development practices. The authors were concerned that most, if not all companies adopting agile were content simply “to suck less” rather than transforming their businesses.

This was further explored in December of last year in a StickyMinds column “Little Scrum Pigs and the Big Bad Wolf” by Michelle Sliger, who expressed her concern that

“Indeed, many companies are refusing to view agile as anything other than a set of engineering practices.”

That surprised me. I thought that this was, in fact, the point of agile software development: for people to adopt more effective software engineering practices.

What is especially confusing is that Scrum, in particular, is really a project management approach and provides very little in the way of software engineering practices. It is intuitive and obvious and easy to implement, maybe too easy, which is why most agile projects today are based on Scrum: its strength, and weakness, is that it provides an effective framework for organizing and managing software projects by breaking them down into time boxed increments, but does not force the team to adopt specific engineering practices and disciplines, unlike other methods, and especially XP.

Martin Fowler of ThoughtWorks, one of the leading thinkers in the agile (in this case, XP, however, rather than Scrum) community, raises the concern that this lack of software engineering discipline can lead to Scrum teams building a lot of sloppy software, however quickly.

Back to the “Three Little Pigs” – the author goes on to express her dismay that

“They have not adopted the value system that is the underlying infrastructure of all agile approaches.”

and that companies who are simply interested in adopting good practices from scrum and XP, but who don’t buy into the complete philosophy and value set, therefore lack vision and lack commitment; and are at risk of failure.

I find the argument to be both elitist and dogmatic, and awfully awfully unclear. The author suggests that there is something hidden in the agile manifesto, that by surrendering to this mystery you will find the one true agile path to success in software development and anything less is conceding defeat, or at the least condemning yourself and your organization to mediocrity.

But what is this mystery, this ineffable something or somethings that organizations refuse to, or are somehow unable to, accept? Perhaps it is delivering working software incrementally, following a timeboxed approach – no, this can’t be it, this is a well understood engineering practice, one of those mere disciplines that the author suggests is insufficient for success. Maybe it is “continuous attention to technical excellence and good design”. That can’t be it: I don’t see why any organization would not accept this as axiomatic when building software. Or is it the emphasis on simplicity? Or that the team should have a good working environment and the trust and support of management? Or that developers and customers should work together? Or maybe that we need to create self-organizing teams? Just what is it that these companies, who are “teetering at the edge between mediocrity and high performance”, are failing to do?

Douglas and Dymond concede that there are too few real agile success stories: they point to Nokia and BMC Software and PatientKeeper of course; a small number of companies (very small, after 10 or so years of evangelism) who have had noted success in adopting Scrum in a fundamental way. But I would argue that there are a lot of success stories – all of those companies who are “sucking less”, who have started on a path to building better and better software: every day, working hard to suck less and still less and less and so on.

While there is a negative connotation to the term, I don't see what is wrong with "sucking less". With being practical, goal-focused, and incremental in improving software development practices. With delivering good, working software in time boxed, iterative releases. With building a stronger development team, and a better development environment. With following good engineering practices and management methods, and stopping bad ones. With constantly reviewing your failures and successes and finding new ways to improve. I don’t see this as building a “house of straw” – I see this as what we all have to do to succeed: constantly, ruthlessly get better and better together.

Thursday, November 13, 2008

Construx SW Development Executive Summit

I have started working again with Construx Software, helping us improve our software engineering practices. I was of course familiar with Steve McConnell, Construx's CEO and his books on software engineering, and I had worked with Construx at a previous company on training and mentoring our development team and development managers.

Earlier this year I attended their 10x Software Engineering course, an excellent software development management course which focuses on understanding and implementing good practices in software development, how to improve quality and team productivity. We enlisted their help on a project assessment with a partner, and Construx is scheduled to come in later this year to teach a Developer Testing Bootcamp course to the development team.
In October I also attended Construx's Software Development Executive Summit: an intimate, intense and highly-focused series of roundtable sessions and high-quality keynotes with the heads of software development and software engineering at large and small companies across North America, Europe and Asia. Like other Construx offerings, the summit was pragmatic, selective, carefully organized and very professionally run. The keynote speakers included Martin Fowler of ThoughtWorks and Ken Schwaber, the creator of Scrum, as well as Construx's CEO Steve McConnell, author of Code Complete and Rapid Development, and Matt Peloquin of Construx; and interesting case studies presented by IT executives at MSNBC and RIM.

It was a unique forum: a chance to meet and share ideas in an open, constructive and respectful environment with serious people who all had extensive experience leading software development and who were all looking for ways to improve. There were so many different stories: companies who had great success (or disappointing failures) at outsourcing (onshore and offshore); companies who were successful delivering using small, agile, results-oriented collocated teams; other companies who followed highly structured, metrics-driven SDLCs and were equally successful. The development organizations ranged in size from a handful of developers to hundreds or thousands of engineers in multiple countries. The roundtable sessions provided me the opportunity to explore problems and share ideas with experienced development managers, product managers and project managers, and thinkers like Martin Fowler. The social engagements provided excellent networking opportunities and were generally good fun, and there was no pressure from vendors or sponsors.

What key ideas did I take back from the summit?

  1. The first key to success is talent. Get the best people you can. Treat them well and support them, give them what they need. Be careful when hiring, and spend time with new hires, help them to be successful. Keep teams together as long as you can: continuity and cohesion of a team pays dividends.
  2. There is no “one way to skin a cat”: software development poses different problems to different organizations, and there are different answers to these problems. What is important is to execute, and to constantly review and improve.
  3. If you want to show value to your customers, deliver value often, deliver what is important first. It’s all about incremental delivery.
  4. In globally distributed teams, follow-the-sun works for operations, but doesn’t for development. Co-locate teams whenever possible.
  5. Develop technical leadership within your organization. Create a path for talented and ambitious technical people who do not fit or do not want to pursue the management track. Follow the lead of IBM, Microsoft and Google and offer a “distinguished engineer” career path where senior technical people are given respect, latitude and a voice in product direction.
  6. Don’t expect to save costs through outsourcing. Outsource for flexibility, to flex your organization’s delivery capability; and to gain access to talent. To outsource successfully takes a lot of discipline and management attention and supporting costs.
  7. Constantly be aware of, and beware of, technical debt. Don’t bet on “throwing one away” when you build a system. Agile methods without discipline (comprehensive reviews or pair programming, developer testing, …) gets fast results at first, but builds up a lot of technical debt that has to be addressed eventually. If you start with disciplined, good practices from the beginning you won't dig yourself as deep a hole.

This is an event I look forward to attending again in the future and will defintely recommend to my colleagues.