Monday, June 27, 2011

Moving forward from Failure

System failures at scale are inescapable, as I have talked about before in the context of designing systems for failure in high-scale computing and how to apply these ideas to enterprise systems. Failures are wasted if you don’t learn enough from them; if the way that you design and deliver application systems, and the way that you deploy and run these systems, don’t get better as a result. You have to find lessons in each failure and constantly move forward, and make the system, and the team, more resilient.

I’ve read and heard a lot of good stuff over the last year or so from the DevOps community on handling system failures: how to minimize the risk of failures through deployment planning, how complex systems fail, how to communicate failures effectively to stakeholders so that you don’t destroy trust, and how to understand failures through postmortem analysis, including Jacob Loomis’ essay “How to Make Failure Beautiful” in the Web Operations book and John Allspaw’s keynote on Advanced Postmortem Fu and Human Error 101 at this year’s Velocity conference.

Many of these ideas fit with my own experience, and fill in some important gaps – they extend beyond the concerns of operating high-volume Web sites to broader, general problems in system operations and systems engineering, and deserve a wider audience outside of the Web operations and Web startup worlds.

Postmortems and Root Cause Analysis

The keys to successful postmortems and Root Cause Analysis are deceptively simple, and therefore difficult to get right:
  • get the right people together in a room.

  • create the right environment for blameless problem solving: make it safe for people to be open and honest, don’t point fingers, focus on facts and solving problems and how to get better.

  • postmortems are expensive and painful, and people want to get out of them as soon as possible. Don’t stop too soon, before the team has really understood the problems, and the solutions.

  • don’t be satisfied with a single root cause – complex system failures usually have multiple causes if you dig deep enough.

  • human error isn’t a root cause – it’s a symptom of something else that you’ve done wrong.
You can’t stop with Root Cause Analysis

Root Cause Analysis is important, but it is just the first step. Once you’ve reviewed a failure as a team and found your way to the root causes or at least identified some real problems, now you have to do something about it, beyond the immediate fixes and workarounds that the team made recovering from the incident.

There are straightforward things that you can do now – detective and corrective actions, quick fixes, low cost and low risk – so you do them. Fix a bug, plug a hole, add defensive coding, add some tests. Better logging and diagnostics and alerting, better error handling, better metrics – you can always do this stuff better – so that ops can see the problem coming or at least recognize it when it happens again. Better troubleshooting tools and training for ops.

Don’t stop with corrective actions either

But it’s still not enough to recover from a failure and patch the holes and tighten things up, or even build a better incident management capability. You have to make sure to find the lessons in each failure, really learn about why the failure happened, how it relates to other failures or problems that you have; and about how you dealt with the failure when it happened, and what you need to do to do a better job the next time. Then you have to act to reduce the risk and cost of failures, take steps to make sure that failures like this one, and even failures that aren’t like this one, don’t happen again. And that when the next failure does happen, that the team is more prepared for it, that you can recover faster and with less stress and impact to the business.

Some of these preventative actions are straightforward: training for developers and testers and ops, and better communications in and especially between teams, checklists, health checks and dependency checks, more disciplined change controls and deployment controls, and other safeties.

But most preventative changes, the ones that make a real difference, are deeper, more fundamental: fixing architecture, culture, organization, or management weaknesses. Fixing these kinds of problems takes longer, involves more people, and costs more. Making changes to the architecture – switching out a core technology or implementing a partitioning strategy to contain failures and to scale up – can take months to work out and implement. Organizational and management changes are hard because this directly impacts people’s jobs. Changing culture is even harder and takes longer, especially to make the changes stick.

You can’t improve what you can’t see – you need data

These problems are also hard to see and understand. It’s naïve to think that you can recognize or prove the need for fundamental changes to architecture or organization or management controls or culture from a postmortem meeting – it takes time and perspective and experience with more than one failure to see this kind of problem. And because the fixes are fundamental and expensive, they can be hard to justify, hard to get management and the business and your own people to buy-in.

You need data to help you understand what you’re doing wrong, what you need to change or what you need to stop doing – and what you’re doing right, what you need to keep doing, and to build a case for change. At last year’s Velocity conference, John Allspaw explained how to use metrics to find patterns and trends in failures, to understand what’s hurting you the most, or hurting you the most often, what’s working well and what’s not. To find out what changes are safe, and what changes aren’t; what failures are cheap and easy to recover from, and what failures can take the company down.

Metrics are important to help you see problems, and to help show if you are learning and getting better. Track the types and severity of failures, frequency of failures, your response to failures – time to detect and time to recover from failures; and the frequency and type and size of changes, and the correlation between changes and failures (by type and size of changes, by type and severity of failures). And make sure to track regressions – the number of times that you take a step backward.

Deciding what to fix, and what not to

Metrics can also help you to decide what you can fix and change, and what’s not worth fixing or changing – at least not for now. You need to recognize when a problem is a true outlier, an isolated case that is unlikely to happen again and that you can accept and move forward. It’s important that you can see the difference between a problem that is a one-of, and a first-of –an indicator of something deeply wrong, a fundamental weakness in the way that the system was built or the way that you work. You don’t want to over-react to outliers but you also don’t can’t treat every problem as unique and miss seeing the patterns and connections, the underlying root causes.

There is diminishing returns in preventing (or even reducing the probability) of some problems, trying to stop the unstoppable. Some problems are too rare, or too expensive or difficult to prevent – and trying to prevent these problems can introduce new complexities and new risks into the system. I agree with John Allspaw that there are situations when it makes more sense to focus on how to react and recover faster, on improving MTTR rather than MTBF, but you need to know when to make that case.

Moving forward from Failures is real work and needs to be managed

People don’t want to think about failures for long – they want to put the mistakes and confusion and badness behind them and move on. And the business and management want priorities back on day-to-day delivery as soon as possible. When failures happen, you need to act fast, get the most that you can out of the moment, make decisions and commitments and reinforce changes while the pain is still fresh.

But fixing real problems in the system or the way that people are organized or the way that they work or the way that they think, can’t be done right away. Building reliability and resilience and operability into how you work and how you think and how you build and test software and how you solve problems takes time and commitment and continuous reinforcement. Management, and the team, have to be made accountable for longer-term preventative actions, for making bigger changes and improvements.

This work needs to be recognized by the business and management and the team and built in to the backlog, and actively managed. You need to remind people of the risks when you see them missing steps or trying to cut corners, or falling back into old patterns of thinking and acting. You’ll need to use metrics and cost data to drive behaviour and to drive change, and to decide how much to push and how often: are you changing too much too often, running too loose; or is change costing you too much, are you overcompensating?

A Resilient system is a DevOps problem

Development can’t solve all of these problems on its own, and neither can Operations. It needs the commitment of development (and by development, I mean everyone responsible for designing, developing, testing, securing and releasing the software) and operations (everyone responsible for building and securing and running the infrastructure, deploying the code, and running and monitoring the system). This is a real DevOps problem: development and operations have to be aligned and work together, communicating and collaborating, sharing responsibilities and technology. This is one of the places where I see DevOps adding real value in any organization.

Tuesday, June 21, 2011

Estimation is not a Black Art

Construx Software is one of the few companies that take the problems of estimation in software development seriously. Earlier this year I attended Steve McConnell’s Software Estimation in Depth course based on his book Software Estimation: Demystifying the Black Art. Two days reviewing factors in estimation and the causes of errors in estimating, the differences between estimates and targets and commitments, how to present estimates to the customer and to management, the importance of feedback and data, estimating techniques that work and why they work, and when and how to apply these techniques to different estimating problems.

You can get a lot out of reading Steve’s book, but the course setting gives you a chance to work with other people and solve real problems in estimation and planning, dig deep into questions with the man himself, and it introduces new material and research not included in the book. The key takeways from this course for me were:

The Basics

Even simple techniques work much better than “expert judgment” (aka wild ass guesses). With training and using straightforward tools and simple mathematical models and following a bit of structure, you can get to 70-75% accuracy in estimating, which is good enough for most of us.

Never estimate on the spot – it is professionally irresponsible, and you’re setting yourself, your team, and your customer up to fail. Always give the person who is doing the estimate time to think. Everyone knows this, but it’s important to be reminded of it, especially under pressure.

People’s systemic error tendency is to underestimate. Many organizations underestimate by a factor of at least 2x. This also applies to comparing back to actual costs: a common mistake is to remember how much you estimated something would take, not how long it actually took.

Estimates are always better if you can use real data to calibrate them: to compare estimates against evidence of how your organization has performed in the past. I knew this. But what I didn’t know is that you don’t need a lot of data points: even a few weeks of data can be useful, especially if it contradicts with judgment and forces you to question your assumptions.

Use different techniques at different stages as you move along a project’s Cone of Uncertainty, depending on how much information you have available at the time, and how high the stakes are – what the cost of estimation errors could be to the business. If you need higher confidence or higher quality estimates, use multiple techniques and compare the results.

I like T-Shirt sizing to help in planning and making a business case. Developers come up with a rough order of magnitude estimate on cost or effort (small, medium, large, extra-large) while the Customer/Product Owner/Product Manager does the same for the expected business value of a feature or change request. Then you match them up: Extra-Large business value and Small development cost gets a big thumbs-up. Small business value and Extra-Large cost gets a big thumbs down.

Estimating by analogy – comparing the work that you need to estimate to something similar that you’ve done before – is a simple technique that we use a lot. It works well if you are adding “another screen”, writing “another report”, or building “another interface”. It’s a good fit for maintenance, if you’ve been working with the same code for a while and know most of the gotchas.

Intact teams (like mine) tend to view problems in a similar way – ideas and experience converge. This is good if you work on similar problems, in maintenance or a long-running project, because you can make decisions quickly and confidently. But this is bad if you are confronted with new problems – you need techniques like Wideband Delphi to challenge people’s thinking patterns and let new ideas in.

Agile Estimating and Story Points and Velocity

We spent more time than I expected exploring issues in estimating Agile development work. Incremental and iterative planning in Agile development poses problems for a lot of organizations. The business/customer needs to know when the system will be ready and how much it will cost so that they can make their own commitments, but the team ideally wants to work this out iteratively, as they go. This means instead that they have to define the scope and cost as much as they can upfront, and then work out the details in each sprint – more like staged or spiral development methods. Once they have the backlog sized, they can plan out sprints based on forecast velocity or historical velocity - if they can figure this out.

I’m still not convinced that Agile story point estimating is better than (or as good as) other techniques, or that programmers sitting around a table playing Planning Poker is really an effective alternative to thoughtful estimating. Story points create some problems in planning new project development, because they are purposefully abstract – too abstract to be useful in helping to make commitments to the business. You might have an idea of how many story points give or take you have to deliver, but what’s a story point in the real world? People who use story points can’t seem to agree on how to define a story point, what a story point means and how or when to use them in estimating.

More fundamentally, you can’t know what a story point costs until the team starts to deliver, by measuring the team’s velocity (the actual story points completed in an iteration).This leaves you with a bootstrapping problem: you can’t estimate how long it is going to take to do something until you do it. You can look at data from other projects (if you’ve tracked this data), but you’re not supposed to compare story points across projects because each project and each team is unique, and their idea of story points may be different. So you have to make an educated guess as to how long it is going to take you to deliver what’s in front of you, and now we’re back to the “expert judgement” problem.

The good news is that it won’t take long to calibrate Story Point estimates against evidence from the team’s actual velocity. Mike Cohn in Succeeding with Agile says that you need at least 5 iterations to establish confidence in a team’s velocity. But Construx has found that you can have a good understanding of a team’s velocity in as little as 2 iterations. That’s not a long time to wait for some kind of answer on how long it should take to get the work that you know that you have in front of you done.

There is more to estimating

There is a lot more to estimating, and to this estimation course: details on different techniques and rules of thumb, models and software tools, how to measure estimation error, how to turn estimates into schedules, how to handle schedule compression and how to stay out of the Impossible Zone. To get a taste of the course, check out this webinar on the 10 Deadly Sins of Software Estimation.

Software estimation, like other problems in managing software development, doesn’t require a lot of advanced technical knowledge. It comes down to relatively simple ideas and practices that need to be consistently applied; to fundamentals and discipline. That doesn’t mean that it is easy to do it right, but it’s not dark magic either.

Monday, June 6, 2011

Safer Software through Secure Frameworks

We have to make it easier for developers to build secure apps, especially Web apps. We can't keep forcing everybody who builds an application to understand and plug all of the stupid holes in how the Web works on their own — and to do this perfectly right every time. What we need is implementation-level security issues taken care of at the language and framework level. So that developers can focus on their real jobs: solving design problems and writing code that works.

Go to the SANS Application Security Street Fighter for my latest post on how to write safer software using secure frameworks, and application frameworks that are secure. And to read more about the OWASP Developer Outreach.



Tuesday, May 17, 2011

Not doing Code Reviews? What’s your excuse?

All of us have known for a long time that code reviews find defects, and that reviews are cheaper and can be more effective than most kinds of testing. In Code Complete, Steve McConnell builds an overwhelming case for code reviews: disciplined code inspections can find between 45%-70% of all defects in code, while even fast, informal reviews can find 20%-30%. Studies at IBM, HP, Microsoft and other places show that it is several times cheaper to find bugs in code reviews than through testing. And evidence keeps coming in to support that code reviews work.
“Reviews catch more than half of a product’s defects regardless of the domain, level of maturity of the organization, or lifecycle phase during which they were applied”. What We Have Learned About Fighting Defects
Recent research into code review practices and advances in tools make reviews more effective and less expensive, and can change the way that we think of code reviews and the way that we do them.

Lightweight code reviews work

A lot of the literature on code reviews, including Code Complete, focus on formal, team-based code inspections, using a model defined by Michael Fagan at IBM in the 1970s. Heavyweight and high-ceremony, Fagan inspections typically involve a minimum of 4 people: the programmer, the reader, a moderator, and one or more reviewers. Each review meeting requires extensive preparation, lots of documentation, and can last several hours.

More people now are having success with lightweight but still disciplined code reviews; a middle ground between informal “hey pal can you take a look at this” over-the-shoulder code walkthroughs, and expensive full-on Fagan inspections. In the Modern Code Review chapter of Making Software, Jason Cohen explains that lightweight reviews can be almost as effective, and much less expensive than formal inspections. The formal review meeting in a Fagan inspection, which is expensive to run and difficult to arrange, is mostly a waste of time – 95% of defects are found before the meeting. The real purpose of the meeting is to communicate the findings and to make sure that the programmer understands them. If that’s the case, the meetings can be held in much less formal way, or not at all.

Tool-assisted reviews

Reviewers today can rely on tools to help make their work more effective and efficient. Static Analysis bug checkers like Findbugs, tools from Coverity and Klocwork, and even checkers built-in to IDEs like IntelliJ Idea make the job of code reviewers easier and more valuable. These tools catch subtle bugs and common mistakes in coding that get past compilers and that can get past reviewers too, they highlight crappy or questionable code, and can enforce style conventions and best practices in coding. This means that reviewers can focus on more fundamental issues like correctness and error handling, and safety and security issues (and these tools, and others like Fortify 360 help find security vulnerabilities too).

Formal review meetings are expensive and difficult to setup. A lot of smaller teams do reviews offline instead through email, with the occasional one-on-one meeting when the programmer or reviewer feels that it is necessary. Bigger, distributed teams can use peer review collaboration tools like Crucible or Review Board or SmartBear’s CodeCollaborator or Google Code Reviews (aka Rietveld) to share code review findings. These tools integrate with your version control system (and sometimes your bug tracker) and are especially useful if you are involving multiple reviewers in different locations and different timezones. Reviewers and the programmer can add annotations or comments directly in with the changes, cutting back on the need for review meetings.

Some teams use these tools to ensure that code reviews are done, and prove that they are being done for compliance: they can enforce workflows (that reviews are done before code is committed to the main code line) and managers (and auditors) can see the results of code reviews. New programmers can look at the review history for code that they are working on to understand more about the code and about how to do an effective review, and programmers and managers can go back over the results of reviews and find ways to improve them. Some of these tools collect code review metrics, and others, like Klocwork Inspect, integrate reviewer findings and static analysis findings into the same review space.

Another code review tool, this time to help with security reviews, is Agnitio from David Rook, the Security Ninja. Agnitio serves a different purpose: rather than helping developers collaborate on a code review, it structures and guides a reviewer through a security review, following a detailed code and design review checklist, and then records the results of each review.

Reviews find more than functional defects

Reviews can find important and fundamental design and implementation problems. This includes subtle logic problems and operational safety weaknesses that testers may not find because they are hard to test for, and reviewers have the “white box advantage” that they can see problems or omissions in the code. And code reviews are important for finding security vulnerabilities – often the only way to find vulnerabilities, except through exhaustive and expensive pen testing. This is why code reviews are a fundamental part of secure SDLC’s like Microsoft’s SDL.

But there’s even more to reviews than finding bugs and security vulnerabilities. An interesting study by Mantyla and Lassenius in 2009 “What types of defects are really discovered in code reviews?” builds on earlier research by Siy and Votta at Bell Labs in the late 1990s, to show that the majority of problems found by reviewers are not functional mistakes, but what the reviewers call evolvability defects: issues that make code harder to understand and maintain, more fragile and more difficult to modify and fix.

On average, between 60% and 75% of the defects found in code reviews fall into this class. Of these, around 1/3 are simple code clarity issues: improving element naming and comments, making sure that the code makes sense. Most of the rest of the findings are organizational problems where the code is poorly structured, or duplicate or unused code; or approach problems where the reviewer can see a much simpler and cleaner implementation, sometimes replacing hand-rolled code with built in language features or library calls. And reviewers can also find changes that don’t belong or aren’t required, copy-and-paste mistakes and inconsistencies.

These defects or recommendations feed back into refactoring and are important for future maintenance of the software, reducing complexity and making it easier to change or fix the code in the future. But it’s more than this: many of these changes also reduce the technical risk of implementation, offering simpler and safer ways to solve the problem, and isolating changes or reducing the scope of a change, which in turn will reduce the number of defects that could be found in testing or escape into the wild.

So why aren’t more people reviewing code?

A study in 2005 found that less than half of development teams are following code reviews.

WTF?

Sure, reviews are hard. One of my colleagues who spends a lot of his time reviewing code finds it exhausting, much harder than writing code himself. To do a good review, you have to spend the time to understand the code and what the change was supposed to do, and then put yourself in to the mind of the programmer and work through the solution approach that they decided on. It takes time and it takes discipline. But the return on investment is clear.

I’ll give a pass to XP-style teams that already follow disciplined pair programming – although the focus of pairing is on finding a good solution, rather than looking for problems, a lot of mistakes and structural issues will still be caught in pair programming. Other problems can be caught by a good static analysis tool. And most of these teams are also writing disciplined unit tests, probably following TDD. They’re not writing sloppy code.

Solo programmers have an obvious problem: if you’re coding on your own, who’s going to review your code? You’re limited to self-reviews: setting the code aside for a while and then reviewing it on your own. This is more effective than you would expect. Jason Cohen says that programmers reviewing their own code can find as many as half of the issues that another reviewer would find, just by taking a second look. And solo programmers can also rely on static analysis tools to find some problems.

Reviews don’t need to be a big deal, you don’t need formal review meetings. And there are tools to help make reviews cheaper, easier and more effective. So, what about the rest of you? Why aren’t you doing code reviews? What’s your excuse?

Wednesday, May 4, 2011

Continuous Deployment is no Holy Grail

In Prerequisites for Continuous Deployment Dan Ackerson asked “What are your major obstacles to deploying continuously to your live servers”?

This must have been a rhetorical question, since my response is “awaiting moderation”. Why ask a question if you don’t want answers?

There are a number of obstacles to deploying meaningful changes continuously to live production servers, besides having a working Continuous Integration environment and following disciplined development practices.

Making interface changes and certifying them with partners. Making database schema and data changes. Security checks. Destructive testing and stress testing for performance-sensitive online transactional systems. And so on. Most of the changes that people talk about releasing continuously are trivial: minor tweaks, cosmetic fiddling or small bug fixes. Anything bigger has to be done more carefully.

Schema changes can’t be made continuously. Bigger functional changes can’t and shouldn’t be made continuously, even with dark launching. Etsy for example (one of the companies used as a poster child for Continuous Deployment), doesn’t continuously deploy bigger public-facing features. They take their time and design them and prototype them and test them and review them and plan them out with operations and customer support and product management like any sane organization. See John Allspaw’s keynote at Surge last year.

Ackerson talks about “sufficient” automated test coverage. Automated testing isn’t enough for every (any?) system or every (any?) company, certainly not automated testing at 35% coverage which is much much lower than say Jez Humble recommends in Continuous Delivery.

You also have to account for code reviews and security checks, which could be done before check-in. This is how some companies are able to achieve Continuous Deployment – they move some of the necessary and responsible steps like code reviews up before check-in, so you know the code is already pretty good.

Too many descriptions of Continuous Deployment make it sound too simple and too easy. It’s not, and even organizations that have a lot of experience with it continue to have security and reliability problems: Facebook, Wordpress, …

Yes there’s a lot to learn from Continuous Deployment, about streamlining and simplifying release and deployment, and reducing risk by breaking work down into smaller and smaller pieces and tying all of this together with ops monitoring and metrics. But it’s not the “Holy Grail of Devops”, or at least it shouldn’t be. There's a lot more to DevOps than Continuous Deployment, which is a good thing.

Monday, May 2, 2011

Checklists, software and software security

There are practical applications of checklists in many different fields. Aviation, project engineering, now even surgery. But what about software? Sure, checklists are sometimes used in code reviews, to good effect. But can we do more, can we get the same thing out of checklists that pilots do, or that surgeons do?

Frank Kim invited me to post on software security at the SANS Application Security Street Fighter's blog. My post on using checklists in software development and software security can be found here.

Thursday, April 14, 2011

Lientz and Swanson on Software Maintenance

For those of us working in software development and studying it, there's a shortage of comprehensive studies to refer to, too little data that developers and managers can trust and draw useful conclusions from. Even worse, too much of the research that we do have is out of date or derivative. A small number of early, foundational studies and the data that they came up with are referenced, reused, repackaged and reinterpreted in more modern contexts by subsequent researchers – we keep going over the same old ground.

This is especially the case for software maintenance. One of these foundational studies in software maintenance, one of the most widely referenced, was done by a team at UCLA led by Benet P. Lientz and E. Burton Swanson back in the late 1970s. They surveyed software maintenance practices at 487 companies, and found that companies spent their time on maintenance activities as follows:

Perfective maintenance - new functional or nonfunctional requirements: 65%
Corrective maintenance - fixing bugs: 17%
Adaptive maintenance - keeping up with changes in the environment: 18%

But wait a minute. Another source quotes the same study of “nearly 500 data processing groups” differently:

Perfective maintenance: 51%
Adaptive maintenance: 24%
Corrective maintenance: 22%
Preventive maintenance: 3%

Sorry, that’s not right. The study was in 1978, not 1980, it was only 69 companies, and it found:

Corrective maintenance: 17.4%
Adaptive maintenance: 18.2%
Perfective maintenance: 60.3%
Other: 4.1%

No, that’s not right either. It was in 1980, there were 487 companies, but the numbers are:

Corrective maintenance: slightly more than 20%
Adaptive maintenance: slightly less than 25%
Perfective maintenance: over 50%
Preventive maintenance: only 5%

This inconsistency was starting to bug me, so I ordered the book detailing the original analysis work, Software Maintenance Management: a Study of the Maintenance of Computer Application Software in 487 Data Processing Organizations by Lientz and Swanson, published in 1980.

A couple of weeks later thanks to Amazon, I had the answer. It turns out that there were two studies. Lientz and Swanson’s analysis started with a pilot study of 69 organizations. This pilot found that on average, 60% of maintenance was spent in enhancements, better documentation and more efficient coding – what Lientz and Swanson called “perfective maintenance”. And that the biggest, most important problems that organizations faced were management problems, not technical problems: trying to find ways to manage escalating customer demands for enhancements and extensions to software.

Not satisfied with the smaller study, they conducted a more detailed study of 487 IT organizations starting in late 1977. The key findings included that on average, development and systems staff spent half of their time on maintenance. The larger the company, the more time was spent on maintenance. Maintenance effort, on average, was broken out as follows:

Corrective Maintenance

Emergency fixes: 12.4%
Routine debugging: 9.3%
21.7%

Adaptive Maintenance

Accommodating changes to data inputs and files: 17.4%
Accommodating changes to hardware and system software: 6.2%
23.6%

Perfective Maintenance

Customer enhancements: 41.8%
Improvements to documentation: 5.5%
Optimization: 4.0%
51.3%

(Not) Preventive Maintenance

Other: 3.4%
3.4%

The most severe maintenance problems, according to maintenance managers:
  • Poor quality application system documentation
  • Excessive demand from customers for changes
  • Competing demands for maintenance personnel time
  • Difficulty meeting schedule commitments
  • Inadequate training of user personnel
  • Turnover in the user organization
The major problem areas for maintenance managers, from the study’s perspective:
  • Customers don’t understand how the system works and what they need it to do: lack of user understanding, lack of user training
  • Programmer effectiveness: low productivity, low motivation, low skill levels
  • Low quality of the system being maintained: inadequate design specs, quality of original code, quality of documentation
  • Programmer availability: competing demands for programmer time
So there we are: the state of software maintenance in 1977. How much of this has changed, really, since then? And why don’t we have better numbers, newer data, on something that most of us will spend most of our careers working on?